Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0051
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN, UNLESS SITE INSPECTIONS SHOW REASON FOR REMOVAL 2) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR PERMIT 3) INSTALL A CONCRETE WASH OUT ON SITE 4) POST A COPY OF YOUR NOI ON SITE 5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE/GRADING/LANDSCAPING WORK 6) CALL FOR INSPECTION FOR ANY QUESTIONS OR CONCERNS WITH THE SITE |