Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP17-0051
Permit Details
Apply Date:
03/10/2017
Applicant:
Tri Miller
Description:
SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
Permit Reviews
Permit Number - DP17-0051
Permit Status: Complete
Permit Description: SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/10/2017 | DEV PKG - OK TO SUBMIT | 03/10/2017 | COMPLETED |
03/10/2017 | SITE and/or GRADING | 04/18/2017 | COMPLETED |
04/18/2017 | RESUB - SITE and/or GRADING | 04/18/2017 | COMPLETED |
04/18/2017 | RESUB - SITE and/or GRADING | 08/17/2017 | COMPLETED |
08/18/2017 | REVISION - SITE | 09/05/2017 | COMPLETED |
10/25/2017 | REVISION - - 2ND | 10/25/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0051
Permit Description: SITE/GRADE/SWPPP - HUGHESOriginal approval 05/03/2017 (16 pages)1st Revision approval 10/25/
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR APPROVED PLAN, UNLESS SITE INSPECTIONS SHOW REASON FOR REMOVAL 2) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR PERMIT 3) INSTALL A CONCRETE WASH OUT ON SITE 4) POST A COPY OF YOUR NOI ON SITE 5) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE/GRADING/LANDSCAPING WORK 6) CALL FOR INSPECTION FOR ANY QUESTIONS OR CONCERNS WITH THE SITE} |
|
09/01/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED} ; {Activity date: 08/17/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS ARE IN PLACE 2) A STABILIZED CONSTRUCTION ENTRANCE IS IN 3) POST YOUR NOI 4) INSTALL A CONCRETE WASH OUT 5) PERFORM SELF INSPECTIONS} |
|
05/17/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/25/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS INSPECTION, WALKED SITE WITH SUPERINTENDENT. NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 03/08/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/30/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 09/01/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |
|
05/17/2018 | ENGR Grading Final | Passed | {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
05/17/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/17/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ} | |
05/31/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
05/31/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
05/31/2018 | ENGR Engineering Final | Passed | {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
05/31/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 05/31/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |