Permit: DP17-0037
Permit Details
Apply Date:
02/13/2017
Applicant:
Description:
GRADING - LA ESTANCIA
Permit Reviews
Permit Number - DP17-0037
Permit Status: Issued
Permit Description: GRADING - LA ESTANCIA
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/13/2017 | GRADING | 03/22/2017 | COMPLETED |
03/27/2017 | REVISION - GRADING | 04/27/2017 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP17-0037
Permite Description: GRADING - LA ESTANCIA
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/23/2020 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 11/23/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/23/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 07/26/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN REPAIRED.} ; {Activity date: 02/09/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH KYLE AND DISCUSSED THE WORK THAT IS HAPPENING ON THE EAST SIDE OF THIS SITE. HE HAS BEEN ADVISED TO CALL INSPECTIONS FOR THE SITE ON A BI-WEEKLY BASIS, AND FOR ALL AREAS WERE THEY ARE INSTALLING DRAINAGE PIPES PRIOR TO BACKFILL PLACEMENT, AND WHEN THEY ARE POURING DRAINAGE STRUCTURES.} ; {Activity date: 06/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/24/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRE-CON INSPECTION CALLED IN, CONSTRUCTION HAS BEEN ACTIVE FOR MORE THAN A MONTH. 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) PERFORM STORM WATER SELF INSPECTIONS 3) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION 4) INSTALL A CONCRETE WASH OUT ON SITE 5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 6) SWEEP UP TRACKED SOIL 7) CALL FOR INSPECTION FOR ANY SITE/ GRADING/ LANDSCAPING CONCERNS} |
10/15/2021 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | {Activity date: 10/15/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 06/26/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready.} ; {Activity date: 04/02/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by VFLORES1 - COMPLETE ALL WORK ON APPROVED DEVELOPMENT PACKAGE FOR FINALS} ; {Activity date: 01/24/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all grading work on approve plan before calling in final.} ; {Activity date: 01/10/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - DP17-0037 covers a lot of areas ranging in different degrees of grading.} ; {Activity date: 12/27/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT THE NOTICE OF TERMINATION FROM ADEQ, REMOVE ALL STORMWATER CONTROLS.} ; {Activity date: 12/13/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all work on development package for calling in final.} ; {Activity date: 11/15/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all work for this development package which falls under multiple areas DP17-0037.} ; {Activity date: 02/21/2018; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT READY FOR THIS INSPECTION AT THIS TIME} |
01/20/2023 | ENGR Engineering Final | N/A | Complete (Recurring) | Complete all work on this site prior to calling in this inspection for the final. This will include all houses on all remaining lots have to be started so that there is no open space. |
11/14/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | Complete the site as shown on the Approved Plans |
Completed Inspections
Permit Status: Issued
Permit Number: DP17-0037
Permit Description: GRADING - LA ESTANCIA
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/20/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/20/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by VFLORES1 - } ; {Activity date: 07/28/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSTALLATION OF THE SITE CONTROLS HAVE BEEN MADE IN VARIOUS AREAS WHERE THERE HAS BEEN SOIL DISTURBANCE. I WILL CONTACT JAY KNOWLES AND ASK THAT HE CHECK THE SITES AND MAKE THE NECESSARY REPAIRS AS NEEDED.} | |
05/01/2023 | SITE - Stormwater Follow-up | Passed | N/A Provide this department with a set of the approved landscape plans and complete all the landscaping as shown on those approved plans. This work will be checked under the grading or landscaping inspection for this permit. | |
08/04/2023 | ENGR Engineering Final | Passed |