Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP17-0037
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
04/02/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by VFLORES1 - COMPLETE ALL WORK ON DEVELOPMENT PACKAGE FOR FINALS |
01/24/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on grading plan before calling for final. |
01/10/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by DMERANZ1 - Read notes from stormwater final. |
12/27/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - WORK IS STILL ON GOING AT THIS TIME, NOT ALL OF THE LOTS HAVE BEEN CONSTRUCTED ON AT THIS TIME. PROVIDE THIS DEPARTMENT WITH ALL THE REQUIRED CLOSEOUT DOCUMENTATION (CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, APPROVED REVISED DRAWINGS, PRIOR TO SCHEDULING THIS INSPECTION. |
12/13/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on development package For final. |
11/15/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Again this development package falls under multiple areas of grading that have not been complete complete all areas for finals. |
06/14/2019 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Complete all work on approve grading plans before calling for final. |
02/21/2018 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - |
01/06/2023 | ENGR Engineering Final | Not Ready | ||
01/20/2023 | ENGR Engineering Final | Complete (Recurring) | Complete all work on this site prior to calling in this inspection for the final. This will include all houses on all remaining lots have to be started so that there is no open space. | |
02/03/2023 | ENGR Engineering Final | Complete (Recurring) | We will work on this song prior to scheduling this inspection for a final | |
05/01/2023 | ENGR Engineering Final | Partial Pass | Complete all work as shown on the approved set of plans for this project this will include but not limited to all landscaping items for this site. Provide an approved of the landscape plans to be utilized for the site inspections to verify that all plants have been installed. | |
08/04/2023 | ENGR Engineering Final | Passed |