Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP17-0037
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Complete (Recurring)
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/23/2020 | PDSD Engineering Division Pre-Construction SITE | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. No concerns at this time. |
11/23/2020 | PDSD Engineering Division Pre-Construction SITE | RLEDONNE | Continued | Entered by PAHUMAD1 - Continue. No concerns at this time. |
07/26/2018 | PDSD Engineering Division Pre-Construction SITE | RLEDONNE | Continued | Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN REPAIRED. |
02/09/2018 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by DROBERT5 - MET WITH KYLE AND DISCUSSED THE WORK THAT IS HAPPENING ON THE EAST SIDE OF THIS SITE. HE HAS BEEN ADVISED TO CALL INSPECTIONS FOR THE SITE ON A BI-WEEKLY BASIS, AND FOR ALL AREAS WERE THEY ARE INSTALLING DRAINAGE PIPES PRIOR TO BACKFILL PLACEMENT, AND WHEN THEY ARE POURING DRAINAGE STRUCTURES. |
06/01/2017 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Approved | Entered by DROBERT5 - |
04/24/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Continued | Entered by DROBERT5 - PRE-CON INSPECTION CALLED IN, CONSTRUCTION HAS BEEN ACTIVE FOR MORE THAN A MONTH. 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) PERFORM STORM WATER SELF INSPECTIONS 3) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION 4) INSTALL A CONCRETE WASH OUT ON SITE 5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 6) SWEEP UP TRACKED SOIL 7) CALL FOR INSPECTION FOR ANY SITE/ GRADING/ LANDSCAPING CONCERNS |