Inspection Status: Complete (Recurring)
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/23/2020 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time. |
| 11/23/2020 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Continued |
Entered by PAHUMAD1 - Continue. No concerns at this time. |
| 07/26/2018 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Continued |
Entered by RLEDONN1 - SWPPP CONTROLS HAVE BEEN REPAIRED. |
| 02/09/2018 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - MET WITH KYLE AND DISCUSSED THE WORK THAT IS HAPPENING ON THE EAST SIDE OF THIS SITE. HE HAS BEEN ADVISED TO CALL INSPECTIONS FOR THE SITE ON A BI-WEEKLY BASIS, AND FOR ALL AREAS WERE THEY ARE INSTALLING DRAINAGE PIPES PRIOR TO BACKFILL PLACEMENT, AND WHEN THEY ARE POURING DRAINAGE STRUCTURES. |
| 06/01/2017 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/24/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 -
PRE-CON INSPECTION CALLED IN, CONSTRUCTION HAS BEEN ACTIVE FOR MORE THAN A MONTH.
1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) PERFORM STORM WATER SELF INSPECTIONS
3) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION
4) INSTALL A CONCRETE WASH OUT ON SITE
5) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
6) SWEEP UP TRACKED SOIL
7) CALL FOR INSPECTION FOR ANY SITE/ GRADING/ LANDSCAPING CONCERNS |