Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/15/2016
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - Tucson Executive Design, airplane hangar expansion, airport.1st Revision is

Permit Reviews

Permit Number - DP16-0205
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Tucson Executive Design, airplane hangar expansion, airport.1st Revision is
Start Date Submittal Complete Date Status  
01/16/2019 DEV PKG 02/22/2019 COMPLETED Review Details
02/22/2019 DEV PKG - RESUBMITTAL 04/18/2019 COMPLETED Review Details
04/01/2020 DEV PKG - OK TO SUBMIT 05/01/2020 COMPLETED Review Details
04/18/2019 DEV PKG - RESUBMITTAL 04/29/2020 COMPLETED Review Details
05/01/2020 REVISION - - 1ST 05/19/2020 COMPLETED Review Details
11/15/2016 DEV PKG - OK TO SUBMIT 11/16/2016 COMPLETED Review Details
11/16/2016 DEV PKG 11/21/2018 COMPLETED Review Details
11/21/2018 DEV PKG 01/17/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0205
Permit Description: SITE/GRADING/SWPPP - Tucson Executive Design, airplane hangar expansion, airport.1st Revision is
Total Completed Inspections - 9
Date Description Inspector Results Comments
10/04/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide SWPPP permit and post the signage as required per your approved plan. Call for stormwater follow-up inspections every two weeks as noted on your plan. Call for inspections of below ground stormwater piping and catch basin when ready}
10/04/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/04/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide SWPPP permit and post the signage as required per your approved plan. Call for stormwater follow-up inspections every two weeks as noted on your plan. Call for inspections of below ground stormwater piping and catch basin when ready}
07/27/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED}
07/27/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED}
07/27/2020 SITE - Stormwater Follow-up Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - PER 9160} ; {Activity date: 06/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues. Gus will monitor the site with monsoons approaching.} ; {Activity date: 06/10/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues. Gus will monitor the site with monsoons approaching.

} ; {Activity date: 04/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - REMOTE INSPECTION WITH GUS, NO ISSUES OR CONCERNS AT THIS TIME.} ; {Activity date: 04/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - REMOTE INSPECTION WITH GUS} ; {Activity date: 02/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time. Walk the site with Gus.} ; {Activity date: 02/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time. Walk the site with Gus.} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some minor track out on private roads outside of site entrance.} ; {Activity date: 02/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Some minor track out on private roads outside of site entrance.} ; {Activity date: 01/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time.} ; {Activity date: 12/24/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time. Controls are in place.} ; {Activity date: 12/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues at this time protections are still in place.} ; {Activity date: 11/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 10/25/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues at this time} ; {Activity date: 10/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no concerns or issues at this time.}
07/27/2020 ENGR Grading Final Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED}
07/27/2020 SITE - Stormwater Final Inspection Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED}
07/27/2020 COT - ENGR - Signage Final Passed {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED}
07/29/2020 ENGR Engineering Final Passed {Activity date: 07/29/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. On July 27 by Dave Roberts.} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED
} ; {Activity date: 07/27/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - APPROVED} ; {Activity date: 04/17/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON THE BUILDING OF PAD GRADES AT THIS TIME.}

Documents

File Name Document Type  
1-6 OF 6.PDF DEVELOPMENT PACKAGE VIEW
GEOTECH.PDF DOCUMENTS VIEW
REVISION_LETTER, 04.29.2020.PDF DOCUMENTS VIEW