Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/04/2019 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Approved |
Entered by DMERANZ1 - Provide SWPPP permit and post the signage as required per your approved plan. Call for stormwater follow-up inspections every two weeks as noted on your plan. Call for inspections of below ground stormwater piping and catch basin when ready |