Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by JSCHNEI2 - APPROVED
|
| 07/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by JSCHNEI2 - APPROVED |
| 07/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by JSCHNEI2 - PER 9190
|
| 04/09/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - CONTRACTOR CONCENTRATING ON BUILDING. REMOTE INSPECTION. PICTURES PROVIDED BY GUS. |
| 07/27/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by JSCHNEI2 - PER 9190
|
| 04/24/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Storm drain catch basin structure. |
| 04/17/2020 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by RSALDAT1 - IS CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON THE BUILDING OF PAD GRADES AT THIS TIME.
|
| 04/14/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - 8 inch storm drain from catch basin location into drainage canal as shown with Ductile Hired above domestic water. Gus with Indevco |
| 12/04/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by SFLORES2 - Contractor focusing on steel building |
| 10/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |