Permit: DP16-0197
Permit Details
Apply Date:
11/10/2016
Applicant:
Description:
SITE/GRADING
Permit Reviews
Permit Number - DP16-0197
Permit Status: Issued
Permit Description: SITE/GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/11/2017 | REVISION - SITE | 08/15/2017 | ACTIVE |
| 11/10/2016 | DEV PKG - OK TO SUBMIT | 11/10/2016 | COMPLETED |
| 11/10/2016 | SITE and/or GRADING | 12/14/2016 | COMPLETED |
| 12/14/2016 | RESUB - SITE and/or GRADING | 12/15/2016 | COMPLETED |
| 12/15/2016 | RESUB - SITE and/or GRADING | 12/23/2016 | COMPLETED |
| 12/23/2016 | RESUB - SITE and/or GRADING | 12/28/2016 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP16-0197
Permite Description: SITE/GRADING
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP16-0197
Permit Description: SITE/GRADING
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 02/24/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONSTRUCTION HAS STARTED, PROGRESS CHECK. NO PRE-CON INSPECTION CALLED IN. 2) ENSURE STORM DRAIN PIPING INSTALLED UNDER THE NEW BLDG IS PRESSURE TESTED PRIOR TO COVER. 3) ENSURE ALL SITE/GRADING/LANDSCAPING MEETS THE APPROVED PLANS 4) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED} |