Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
2797 N CERRADA DE BETO
Apply Date:
09/20/2016
Applicant:
Description:
SITE/GRADING - BUILDING ADDITION WITH PARKINGOriginally approved 11/7/2016 (11 pages)1st Rev

Permit Reviews

Permit Number - DP16-0168
Permit Status: Complete
Permit Description: SITE/GRADING - BUILDING ADDITION WITH PARKINGOriginally approved 11/7/2016 (11 pages)1st Rev
Start Date Submittal Complete Date Status  
04/11/2017 DEV PKG - REVISION 05/18/2017 COMPLETED Review Details
06/21/2018 DEV PKG - REVISION 07/03/2018 COMPLETED Review Details
09/20/2016 DEV PKG - OK TO SUBMIT 09/22/2016 COMPLETED Review Details
09/22/2016 DEV PKG 10/27/2016 COMPLETED Review Details
10/27/2016 DEV PKG 04/04/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0168
Permit Description: SITE/GRADING - BUILDING ADDITION WITH PARKINGOriginally approved 11/7/2016 (11 pages)1st Rev
Total Completed Inspections - 9
Date Description Inspector Results Comments
11/27/2018 SITE - Stormwater Follow-up Passed {Activity date: 11/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 09/26/2018; Status: Continued; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - REMOVE DIRT AND DEBRIS ON SOUTHERN EDGE OF SITE ABOVE WASH} ; {Activity date: 09/19/2018; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - I did not see any issues at this time.}
11/27/2018 SITE - Stormwater Final Inspection Passed {Activity date: 11/27/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - }
11/28/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/28/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/28/2018 ENGR Grading Final Passed {Activity date: 11/28/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/28/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 11/28/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
11/28/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/28/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - } ; {Activity date: 09/19/2018; Status: Denied; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Gus 661-8879}
11/28/2018 COT - ENGR - Signage Final Passed {Activity date: 11/28/2018; Status: Approved; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - }
12/31/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/31/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/11/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 11/27/2018; Status: Partial Approval; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - plants ok, install ground cover as specified.}
12/31/2018 ENGR Engineering Final Passed {Activity date: 12/31/2018; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 12/11/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Andy Briefer owner of this property and the adjacent property, at 250 - 7764 will stabilized the undeveloped lot of which three houses were demolished and the area was used for construction staging.
Gus with indevco construction will correct drainage where roof scuppers are close to sidewalks. Complete Landscaping and D g installation, finish minor clean up in various areas. Install bicycle parking. And provide the letter of certification of grade from engineer for final approval.} ; {Activity date: 11/16/2018; Status: Not ready for Inspection; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - engineering inspector has no issues preventing a TCO for Staffing purposes. Complete Landscaping riprap and cleanup of debris. Call for all required remaining inspections when ready. Provide a letter from your engineer of record verifying grading and drainage is in accordance to approved plans} ; {Activity date: 11/27/2018; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Inspector has no issues that would prevent the temp c of o. Joe and Corey on site. Complete work shown on plan such as sidewalk scuppers, ground coverings, bike parking, Landscaping Etc. Remove trash and trimmings along site perimeter}

Documents

File Name Document Type  
001_GENERAL NOTES / LEGEND_1-11.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING NOTES / DETAILS_2-11.TIF DEVELOPMENT PACKAGE VIEW
003_HDZ PLAN_3-11.TIF DEVELOPMENT PACKAGE VIEW
004_DEMOLITION_4-11.TIF DEVELOPMENT PACKAGE VIEW
005_SITE_5-11.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING_6-11.TIF DEVELOPMENT PACKAGE VIEW
007_GRADING_7-11.TIF DEVELOPMENT PACKAGE VIEW
008_7A OF 11.TIF DEVELOPMENT PACKAGE VIEW
009_7B OF 11.TIF DEVELOPMENT PACKAGE VIEW
010_7C OF 11.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE_8-11.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE_9-11.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION_10-11.TIF DEVELOPMENT PACKAGE VIEW
014_L-4 10A OF 11.TIF DEVELOPMENT PACKAGE VIEW
015_L-5 10B OF 11.TIF DEVELOPMENT PACKAGE VIEW
016_L-6 10C OF 11.TIF DEVELOPMENT PACKAGE VIEW
011_L-7 11-11.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW