Permit: DP16-0168

Parcel: Unknown

Inspection Status: Passed

Inspection History: ENGR Engineering Final

Permit Number - DP16-0168

Inspection Description - ENGR Engineering Final

Inspection Status - Passed

Date Description Inspector Results Comments
12/31/2018 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 -
12/11/2018 ENGR Engineering Final bbenedo1 Not ready for Inspection Entered by BBENEDO1 - Andy Briefer owner of this property and the adjacent property, at 250 - 7764 will stabilized the undeveloped lot of which three houses were demolished and the area was used for construction staging. Gus with indevco construction will correct drainage where roof scuppers are close to sidewalks. Complete Landscaping and D g installation, finish minor clean up in various areas. Install bicycle parking. And provide the letter of certification of grade from engineer for final approval.
11/16/2018 ENGR Engineering Final bbenedo1 Not ready for Inspection Entered by BBENEDO1 - engineering inspector has no issues preventing a TCO for Staffing purposes. Complete Landscaping riprap and cleanup of debris. Call for all required remaining inspections when ready. Provide a letter from your engineer of record verifying grading and drainage is in accordance to approved plans
11/27/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Inspector has no issues that would prevent the temp c of o. Joe and Corey on site. Complete work shown on plan such as sidewalk scuppers, ground coverings, bike parking, Landscaping Etc. Remove trash and trimmings along site perimeter
12/31/2018 ENGR Engineering Final BBENEDON Approved Entered by CBELL1 -
12/11/2018 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by CBELL1 - Andy Briefer owner of this property and the adjacent property, at 250 - 7764 will stabilized the undeveloped lot of which three houses were demolished and the area was used for construction staging. Gus with indevco construction will correct drainage where roof scuppers are close to sidewalks. Complete Landscaping and D g installation, finish minor clean up in various areas. Install bicycle parking. And provide the letter of certification of grade from engineer for final approval.
11/16/2018 ENGR Engineering Final BBENEDON Partial Approval Entered by CBELL1 - engineering inspector has no issues preventing a TCO for Staffing purposes. Complete Landscaping riprap and cleanup of debris. Call for all required remaining inspections when ready. Provide a letter from your engineer of record verifying grading and drainage is in accordance to approved plans