Permit Details

Status:
Complete
Type:
Development Package
Address:
7070 E 21ST ST
Address NEW:
7070 E 21ST ST
Apply Date:
09/20/2016
Applicant:
Philip Veneziano
Description:
SITE/GRADING NEW BLDG

Permit Reviews

Permit Number - DP16-0166
Permit Status: Complete
Permit Description: SITE/GRADING NEW BLDG
Start Date Submittal Complete Date Status  
01/12/2017 RESUB - SITE and/or GRADING 01/13/2017 COMPLETED Review Details
09/20/2016 DEV PKG - OK TO SUBMIT 09/21/2016 COMPLETED Review Details
09/21/2016 SITE and/or GRADING 10/26/2016 COMPLETED Review Details
10/26/2016 RESUB - SITE and/or GRADING 11/01/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0166
Permit Description: SITE/GRADING NEW BLDG
Total Completed Inspections - 6
Date Description Inspector Results Comments
11/17/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 11/17/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO CONTACT ON SITE
2) REVIEWED PLANS, SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED.
3) SPOKE WITH SUPERINTENDENT
4) SWEEP UP TRACKING OFF OF ADJACENT PUBLIC ROADWAY} ; {Activity date: 11/14/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE DEVELOPER/CONTRACTOR ON SITE IN THE AFTERNOON TOOK A LOOK AT THE WORK THAT THEY WILL BE PERFORMING. I HAVE ADVISED THEM THAT THEY ARE LESS THAN AN ACRE FOR THIS SITE SO THEY ARE NOT REQUIRED TO HAVE A SWPPP, BUT THEY WILL BE REQUIRED TO MAINTAIN THE SITE. MIKE RUSSO WILL COME OUT TO THE SITE ON 11/15/16 FOR THE REMAINING PRE-CON MEETING AND DISCUSS THE OPERATION. NO WORK HAS BEEN STARTED ON THIS SITE AT THIS TIME.}
01/31/2017 COT - ENGR - Signage Final Passed {Activity date: 01/31/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/06/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/06/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/06/2017 ENGR Grading Final Passed {Activity date: 02/06/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/17/2017 ENGR Engineering Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/07/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE PEDESTRIAN ACCESS FROM THE STREET TO THE BLDG, ENSURE IT MEETS ADA}
07/02/2017 RSBU - Building Final Passed {Activity date: 07/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_SITE_1 OF 5.TIF DEVELOPMENT PACKAGE VIEW
002_LANDSCAPE_2 OF 5.TIF DEVELOPMENT PACKAGE VIEW
003_LANDSCAPE NOTES / DETAILS_3 OF 5.TIF DEVELOPMENT PACKAGE VIEW
004_PAVING / GRADING / SITE_4 OF 5.TIF DEVELOPMENT PACKAGE VIEW
005_WATER HARVESTING_5 OF 5.TIF DEVELOPMENT PACKAGE VIEW
001_SITE_1 OF 4.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING_4 OF 4.TIF DEVELOPMENT PACKAGE VIEW
003_A1.0.TIF DEVELOPMENT PACKAGE VIEW
004_P1.0.TIF DEVELOPMENT PACKAGE VIEW
005_E1.0.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW