Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
10120 E OLD VAIL RD
Apply Date:
09/01/2016
Applicant:
Tri Miller
Description:
GRADING & SWPPP

Permit Reviews

Permit Number - DP16-0158
Permit Status: Complete
Permit Description: GRADING & SWPPP
Start Date Submittal Complete Date Status  
09/01/2016 DEV PKG - OK TO SUBMIT (GRADING ONLY) 09/01/2016 COMPLETED Review Details
09/01/2016 GRADING 10/04/2016 COMPLETED Review Details
10/06/2016 GRADING 10/06/2016 ACTIVE Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0158
Permit Description: GRADING & SWPPP
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/19/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/19/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSTALLSEDIMENT CONTROLS PER PLAN
2) MAINATIN PERIMETER CONTROLS THROUGHOUT CONSTRUCTION
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE
5) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM WATER WORK
6) POST YOUR NOI ON SITE
7) ENSURE ANY NPPO REQUIREMENTS ARE MET}
10/31/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 10/31/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED
2) ADDITIONAL SEDIMENT CONTROLS MAY BE REQUIRED IF EXISTING CONTROLS ARE NOT WORKING.
3) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE
4) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP.
5) POST A COPY OF YOUR NOI ON SITE
6) SWEEP UP TRACKING
7) CALL FOR INSPECTION PRIOR TO COVERING UNDERGROUND STORM PIPE OR DRAINAGE STRUCTURES}
05/04/2017 SITE - Stormwater Follow-up Passed {Activity date: 05/04/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/13/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/09/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/11/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, NO CONCERNS AT THIS TIME} ; {Activity date: 11/17/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
05/04/2017 SITE - Stormwater Final Inspection Passed {Activity date: 05/04/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SITE IS 100% STABILIZED AND FILE YOUR NOTICE OF TERMINATION WITH ADEQ}
05/11/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 05/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/18/2017 COT - ENGR - Signage Final Passed {Activity date: 05/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/19/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE LANDSCAPING MATERIALS AND THE PLACEMENT OF THE ROCK RIP RAP AS SHOWN ON THE APPROVED PLANS}
05/19/2017 RSBU - Building Final Passed {Activity date: 05/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
05/19/2017 ENGR Engineering Final Passed {Activity date: 05/18/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE TREE STAKING AND THE ROCK RIPRAP PLACEMENT} ; {Activity date: 05/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE LANDSCAPING MATERIALS AND THE PLACEMENT OF THE ROCK RIP RAP AS SHOWN ON THE APPROVED PLANS} ; {Activity date: 05/04/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL}
05/19/2017 ENGR Grading Final Passed {Activity date: 05/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/13/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RE-BAR LAY OUT FOR TRASH ENCLOSURE APRONS INSTALLED PER THE CITY OF TUCSON DEV STD 6-01.0 - OK TO POUR CONCRETE} ; {Activity date: 03/16/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - RE-BAR FOR TRASH ENCLOSURE CORRECTED
SUPPLEMENTAL RE-BAR INSTALLED - OK TO COVER} ; {Activity date: 03/09/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - TRASH ENCLOSURE @ SE CORNER OF BLDG DOES NOT MEET THE COT STD 6-01.0 FOR STRUCTURAL DESIGN.
PROVIDE FOOTINGS AND RE-BAR PER THE ABOVE LISTED COT DETAIL}