Permit Details

Status:
Complete
Type:
Development Package
Address:
1323 W PRINCE RD
Address NEW:
1323 W PRINCE RD
Apply Date:
07/25/2016
Applicant:
Lisa Bowers
Description:
SITE

Permit Reviews

Permit Number - DP16-0125
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
06/21/2017 REVISION - SITE 07/18/2017 COMPLETED Review Details
07/18/2017 REVISION - SITE 07/18/2017 COMPLETED Review Details
07/25/2016 DEV PKG - OK TO SUBMIT 07/25/2016 COMPLETED Review Details
07/26/2016 SITE and/or GRADING 09/20/2016 COMPLETED Review Details
09/20/2016 SITE and/or GRADING 10/21/2016 COMPLETED Review Details
10/21/2016 RESUB - SITE and/or GRADING 11/01/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0125
Permit Description: SITE
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/19/2017 ENGR Engineering Final Passed {Activity date: 07/19/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/31/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I MET WITH THE CONTRACTOR AND THE ARCHITECTURE OF RECORD TO LOOK AT THE CONCERNS THAT WE HAVE AT THIS TIME WITH THE CHANGING OF SPACE USAGES FOR THE BUILDING. SERVICE ACCESS TO THE SITE AND PARKING WILL HAVE TO BE ADJUSTED AND MAINTAINED ON THE NORTHSIDE OF THE SITE TILL THE LEGAL 2 WAY ACCESS IS PROVIDED FOR THE CUSTOMERS AND OWNERS OF THIS SITE. GENE GOLDSTEIN WILL BE WORKING ON HAVING THE CONTRACTOR TO PROVIDE ACCESS THAT WILL MEET THE MINIMUM REQUIREMENTS FOR ALL CONCERNS. I ALSO REMINDED THE CONTRACTOR OF THE REQUIREMENTS FOR BOLLARDS OR A 6 INCH VERTICAL SERPERATION IN ALL AREAS WHERE THE SIDEWALK AND PAVEMENT GRADES ARE AT THE SAME ELEVATION.} ; {Activity date: 01/30/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ONSITE WITH BILL FROM CAYLOR CONSTRUCTION AND DISCUSSED THE ISSUES THAT HAVE ARISEN DUE TO WANTING TO KEEP THE BUILDING OPEN FOR CUSTOMERS DURING THE CONSTRUCTION PHASE CHANGES. I AM CONCERNED ABOUT THE LACK OF PROPER INGRESS AND EGRESS OF THE SITE FOR THE GENERAL PUBLIC AND THE TENNANTS DURING THE REMAINING CONSTRUCTION. THE NORTHERN PORTION OF THE SITE WILL NEED TO BE UNDER CONSTRUCTION FULLY FOR THE REMAINDER OF THE WORK. ALSO THE ACCESS INTO THE SITE WILL BE LIMITED TO A ONE WAY ROAD WHICH WILL NOT SUPPORT 2 WAY TRAFFIC ALONG THE EAST SIDE OF THE BUILDING. WE ALSO DISCUSSED THE REQUIREMENTS FOR BOLLARDS OR A 6 INCH VERTICAL SERPERATION IN ALL AREAS WHERE THE SIDEWALK AND PAVEMENT GRADES ARE AT THE SAME ELEVATION.} ; {Activity date: 01/27/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE WORK NOT COMPLETED PER THE APPROVED PLANS
2) SIDEWALK NEEDS A VERTICLE SEPARATION BETWEEN THE WALKWAK AND THE VEHICLE TRAVEL LANE - PER CODE
3) TRASH ENCLOSURE NEEDS TO MEET THE MIN. STANDARD DETAIL SHOWN IN COT DEV STD 6-01.0.

CALL FOR RE-INSPECTION WHEN SITE/GRADING/LANDSCAPING IS COMPLETED}

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 3.TIF DEVELOPMENT PACKAGE VIEW
002_DEVELOPMENT_2 OF 3.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING_3 OF 3.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW