Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
2222 N CRAYCROFT RD
Apply Date:
04/18/2016
Applicant:
Jeffrey Stanley
Description:
SITE

Permit Reviews

Permit Number - DP16-0068
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
04/18/2016 DEV PKG - OK TO SUBMIT 04/22/2016 COMPLETED Review Details
04/22/2016 SITE and/or GRADING 06/03/2016 COMPLETED Review Details
06/03/2016 RESUB - SITE/GRADING ALL 06/06/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0068
Permit Description: SITE
Total Completed Inspections - 5
Date Description Inspector Results Comments
02/09/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/09/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/09/2017 COT - ENGR - Signage Final Passed {Activity date: 02/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/03/2017 RSBU - Building Final Passed {Activity date: 03/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
03/03/2017 ENGR Engineering Final Passed {Activity date: 03/03/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE HAS EXISTING SIDEWALKS THAT ARE NOT COMPLIANT AT THIS TIME. RON HAS BEEN ADVISED BY ARMANDO QUIROZ THAT THE EXISTING CONDITIONS IS NOT TO HOLD UP THE CERTIFICATE OF OCCUPANCY AS LONG AS THE NEW MATERIALS ARE COMPLIANT. IN AREAS WHERE THE EXISTING MATERIAL TIES INTO THE NEW MATERIAL PORTION OF THE NEW IS NON COMPLIANT DUE TO THE EXISTING CROSS SLOPE CONDITIONS. IT APPEARS THAT 505 PLUS OF THE SIDEWALKS AROUND THIS SITE ARE NON-COMPLIANT FOR THE CROSS SLOPES.} ; {Activity date: 02/28/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR A TEMPORARY C OF O AT THIS TIME, THE WEST HANDICAP SPOT IS SCHEDULED TO BE REPAIRED ON 3/1/17 PENDING THE RAIN. MET WITH A&S PAVING, THEY WILL TRY TO PERFORM A SKIN PATCH OVER THE AREA TO FILL THE LOW SPOTS. THEY WILL RECALL THIS INSPECTION WHEN THEY HAVE COMPLETED THE WORK.} ; {Activity date: 02/27/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SAL WITH A & S PAVING CONTACTED ME ABOUT THIS SITE TO SEE WHAT THEY NEEDED TO DO. ADVISED THEM THAT THE CROSS SLOPE AND THE RUNNING SLOPE WAS OUT IN DIFFERENT AREAS AND NEED TO BE BROUGHT BACK INTO TOLERANCE.} ; {Activity date: 02/27/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE WORK ON THE WEST HANDICAP PARKING SPACE TO BRING IT WITHIN TOLLERANCE, CURRENTLY OUT OF COMPLIANCE OM BOTH THE RUNNING AND CROSS SLOPES.} ; {Activity date: 02/10/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRIED TO MEET JOE OUT ON THE SITE AND ADVISE HIM OF THE DECISIONS THAT HAVE BEEN MADE FOR THE HANDICAP ACCESS RAMPS ON SITE.I TALKED WITH CLAYTON AND DISCUSSED THE CURRENT SITE CONDITIONS: 1) NEW ACCESS RAMP IS OUT OF SPEC FOR THE CROSS SLOPES, THE RESOLUTION IS THAT THIS AREA IS NEW WILL HAVE TO BE BROUGHT INTO COMPLIANCE PRIOR TO IT SITE WORK BEING APPROVEDE. 2) EXISTING SIDEWALK ARE IN AND OUT OF SPEC AROUND THE SITE FOR CROSS SLOPES EXCEEDING 2%. THESE WILL REMAIN AS IS UNLESS THEY ARE NEW SIDEWALK. 3) THE EXISTING RAMPS AND PARKING SPACES WILL REMAIN AS THEY ARE. WE HAVE ADVISED THE DEVELOPER OF THESE CONDITIONS AND THIS COMMENT ON THIS DAY IS TO VERIFY THAT WE HAVE RAISED IT AS A POSSIBLE ISSUE. THE EXISTING RAMPS ARE CONSTRUCTED OUT OF ASPHALT AND HAVE GRADES FROM 11% TO 13% IN THE RUNNING SLOPE, EXCEEDING THE 8.33% MAXIMUM ALLOWABLE.} ; {Activity date: 02/16/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CONTRACTOR, A&S PAVING HAS CONTACTED ME AND ASKED TO MEE ON SITE TOMORROW AT 11:30 ONSITE AND DISCUSS WHAT THEY CAN DO TO MAKE THE NECESSARY REPAIRS FOR THE SITE.} ; {Activity date: 02/16/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE DEVELOPER AND LOOKED OVER THE AREA OF CONCERN. THE NEW PARKING SPACE DOES NOT MEET THE MAXIMUM ALLOWABLE CROSS SLOPES WITHIN THE PARKING SPACES AND ACCESS AISLE. CURRENTLY THE DEVELOPER WILL TRY TO GRIND THE PAVEMENT TO MAKE THE GRADES WORK WITH THE NEW LANDING IN THE SIDEWALK.} ; {Activity date: 02/17/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH A&S PAVING AND DISCUSSED THE REPAIRS THAT NEED TO BE DONE ON THE NEW HANDICAP ACCESS RAMP AND PARKING SPACES ON THE SOUTH SIDE OF THE SITE. I ADVISED THEM THAT NONE OF THE AREAS WITHIN THIS ACCESSABLE AREA CAN BE MORE THAN 2% IN ANY DIRECTION FROM THE GRADE OF RAMP LANDING. THEY LOOKED OVER THE AREA OF THE ACCESS AISLE, WILL NEED TO BE RAISED UPTO 2 TO 3 AT THE MOST TO MEET THE REQUIRED GRADES. THIS WILL REQUIRE THAT BOTH OF THE SPACES WILL NEED TO BE MODIFIED FROM THEIR CURRENT CONDITIONS. THEY WILL DISCUSS THIS WITH THE DEVELOPER BEFORE MAKING ANY ADDITIONAL DECISIONS TO START THE WORK.} ; {Activity date: 02/09/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE HAS BEEN CHECKED FOR THE ADA COMPLIANCE FOR ALL OF THE AREAS, THEY EXCEED THE MAXIMUM CROSS SLOPE COMPLIANCE FOR THE PARKING AND ACCESS AISLES. THIS WILL BE CHECKED WITH THE BUILDING OFFICIAL PRIOR TO FINALING THIS SITE.}

Documents

File Name Document Type  
001_1 OF 1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW