Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/18/2016
Applicant:
Description:
SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)

Permit Reviews

Permit Number - DP16-0030
Permit Status: Complete
Permit Description: SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)
Start Date Submittal Complete Date Status  
02/18/2016 DEV PKG - OK TO SUBMIT 02/18/2016 COMPLETED Review Details
02/18/2016 DEV PKG 04/08/2016 COMPLETED Review Details
03/06/2017 DEV PKG - REVISION 03/08/2017 COMPLETED Review Details
04/08/2016 DEV PKG 05/31/2016 COMPLETED Review Details
05/31/2016 DEV PKG 06/23/2016 COMPLETED Review Details
06/23/2016 DEV PKG - RESUBMITTAL 10/06/2016 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP16-0030
Permit Status: Complete
Permit Description: SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)
Total Outstanding Activity Conditions - 1
Date Name
06/20/2016 Dedication of the proposed right-of-way along Allen Road must be completed and recordation information must be provided for final revised DP before final Certificates of Occupancy will be approved.

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0030
Permit Description: SITE/PLOT PLAN/GRADING/SWPP BANNER UMC NORTHREVISION #1 (PG 3-4 & 46-53)
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/01/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 07/01/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AND EXIT PER YOUR PLAN
4) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR STORM WATER PERMIT
5) INSTALL AND MAINTAIN A CONCRETE WASH OUT ON SITE
6) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT PROPERTY
7) CALL FOR INSPECTION FOR ANY SITE CONCERNS
8) CHANGES MADE TO SWPPP WERE ANNOTATED ON THE SWPPP DRAWING.}
07/01/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/01/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AND EXIT PER YOUR PLAN
4) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR STORM WATER PERMIT
5) INSTALL AND MAINTAIN A CONCRETE WASH OUT ON SITE
6) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT PROPERTY
7) CALL FOR INSPECTION FOR ANY SITE CONCERNS
8) CHANGES MADE TO SWPPP WERE ANNOTATED ON THE SWPPP DRAWING.}
04/11/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGE, COMPLETE LANDSCAPING PER PLAN, CALL FOR FINAL} ; {Activity date: 09/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS BEING MADE}
04/11/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/11/2019 ENGR Engineering Final Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/11/2019 SITE - Stormwater Follow-up Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/17/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/15/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/02/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RETAINING WALL NOT SHOWN ON THE SITE DEVELOPMENT PLAN, ONLY SHOWN ON THE ARCHITECTURAL PLANS.
2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/20/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU COMPLY WITH YOUR STORM WATER PERMIT AND SWPPP PLAN} ; {Activity date: 01/09/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
SWEEP UP TRACKED SOIL.} ; {Activity date: 12/22/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE NORTH SIDE OF THE SITE
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
} ; {Activity date: 12/09/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/27/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
CONTINUE TO MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
2) REPAIR OF SD PIPE ALONG NORTH SIDE.
3) CONTRACTOR INSTALLING RET. SYSTEM} ; {Activity date: 10/03/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/15/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/13/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR INSTALL OF TWO 8" PVC ROOF DRAINS AND TIE IN TO MAIN 42" TRUNK LINE - OK TO COVER
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 09/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/30/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) PROGRESS INSPECTION OF STORM WATER PIE INSTALL AND PREP FOR UNDERGROUND RETENTION BASIN INSTALL.
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.} ; {Activity date: 08/05/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE COMPLIANCE WITH YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION} ; {Activity date: 08/03/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR INSTALLING 24" HDPE STORM PIPE FROM WEST TO EAST W/ 8" AND 12" LATERAL LINES - OK TO COVER
2) RE-ESTABLISH PERIMETER STORM WATER SEDIMENT CONTROLS ALONG NORTH SIDE OF SITE
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/26/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MIKE WILL RECHECK THIS SITE LATER THIS WEEK.} ; {Activity date: 08/01/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/29/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/21/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - CONTRACTOR INSTALLING 48" HDPE STORM PIPE.
INSTALLED "T" FOR ROOF TIE-IN
NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRCTOR INSTALLING SECTIONS OF 48" HDPE TRUNK LINE STORM PIPE, RUNNING SOUTH TO NORTH - OK TO COVER COMPLETED SECTIONS
2) ENSURE STORM WATER PLAN IS COMPLIED WITH THROUGHOUT CONSTRUCTION

NO OTHER SITE CONCERNS AT THIS TIME} ; {Activity date: 07/15/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE APPEARS TO BE OKAY AT THIS TIME, THERE APPEARS TO BE NO ISSUES AT THIS TIME.} ; {Activity date: 07/18/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME} ; {Activity date: 07/13/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR INSTALLED APPROXIMATELY 280' OF 36" HDPE STORM PIPE ALONG THE SOUTH PERIMETER OF THE SITE.
2) PIPE INSTALLED PER APPROVED PLANS - TRENCH BEDDED/PIPE BEDDED TO SPRING LINE - OK TO COVER
3) ENSURE TO CALL FOR INSPECTION FOR VERIFICATION OF LATERAL CONNECTIONS AND CATCH BASIN INSTALLS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
04/11/2019 ENGR Grading Final Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/11/2019 SITE - Stormwater Final Inspection Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/11/2019 COT - ENGR - Signage Final Passed {Activity date: 04/11/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
PAG DP16-0030 BANNER NORTH - 1ST REVIEW (1).PDF DOCUMENTS VIEW
PAG DP16-0030 BANNER NORTH - 1ST REVIEW (2).PDF DOCUMENTS VIEW
TUCSON WATER DP16-0030.PDF DOCUMENTS VIEW
TEP MAP DP16-0030.PDF DOCUMENTS VIEW
RWRD LETTER DP16-0030.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW