Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP16-0030
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/01/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE AND EXIT PER YOUR PLAN 4) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM PER YOUR STORM WATER PERMIT 5) INSTALL AND MAINTAIN A CONCRETE WASH OUT ON SITE 6) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT PROPERTY 7) CALL FOR INSPECTION FOR ANY SITE CONCERNS 8) CHANGES MADE TO SWPPP WERE ANNOTATED ON THE SWPPP DRAWING. |