Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP16-0030
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2019 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - |
10/17/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
09/15/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
05/02/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) RETAINING WALL NOT SHOWN ON THE SITE DEVELOPMENT PLAN, ONLY SHOWN ON THE ARCHITECTURAL PLANS. 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
01/20/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - ENSURE YOU COMPLY WITH YOUR STORM WATER PERMIT AND SWPPP PLAN |
01/09/2017 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SWEEP UP TRACKED SOIL. |
12/22/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE NORTH SIDE OF THE SITE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
12/09/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
12/07/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
10/27/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
10/12/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME CONTINUE TO MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 2) REPAIR OF SD PIPE ALONG NORTH SIDE. 3) CONTRACTOR INSTALLING RET. SYSTEM |
10/03/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
09/15/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
09/13/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRACTOR INSTALL OF TWO 8" PVC ROOF DRAINS AND TIE IN TO MAIN 42" TRUNK LINE - OK TO COVER 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
09/12/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
08/30/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) PROGRESS INSPECTION OF STORM WATER PIE INSTALL AND PREP FOR UNDERGROUND RETENTION BASIN INSTALL. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. |
08/05/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) ENSURE COMPLIANCE WITH YOUR SWPPP 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION |
08/03/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRACTOR INSTALLING 24" HDPE STORM PIPE FROM WEST TO EAST W/ 8" AND 12" LATERAL LINES - OK TO COVER 2) RE-ESTABLISH PERIMETER STORM WATER SEDIMENT CONTROLS ALONG NORTH SIDE OF SITE 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
07/26/2016 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MIKE WILL RECHECK THIS SITE LATER THIS WEEK. |
08/01/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/29/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME |
07/21/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - CONTRACTOR INSTALLING 48" HDPE STORM PIPE. INSTALLED "T" FOR ROOF TIE-IN NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/20/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRCTOR INSTALLING SECTIONS OF 48" HDPE TRUNK LINE STORM PIPE, RUNNING SOUTH TO NORTH - OK TO COVER COMPLETED SECTIONS 2) ENSURE STORM WATER PLAN IS COMPLIED WITH THROUGHOUT CONSTRUCTION NO OTHER SITE CONCERNS AT THIS TIME |
07/15/2016 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - THE SITE APPEARS TO BE OKAY AT THIS TIME, THERE APPEARS TO BE NO ISSUES AT THIS TIME. |
07/18/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME |
07/13/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRACTOR INSTALLED APPROXIMATELY 280' OF 36" HDPE STORM PIPE ALONG THE SOUTH PERIMETER OF THE SITE. 2) PIPE INSTALLED PER APPROVED PLANS - TRENCH BEDDED/PIPE BEDDED TO SPRING LINE - OK TO COVER 3) ENSURE TO CALL FOR INSPECTION FOR VERIFICATION OF LATERAL CONNECTIONS AND CATCH BASIN INSTALLS. 4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |