Permit: DP15-0191
Permit Details
Apply Date:
10/30/2015
Applicant:
Description:
TENTATIVE PLAT/FLD - MOUNTAIN VAIL ESTATES PART G, LOTS 1-95
Permit Reviews
Permit Number - DP15-0191
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - MOUNTAIN VAIL ESTATES PART G, LOTS 1-95
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/22/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 01/25/2016 | COMPLETED |
01/25/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 01/29/2016 | COMPLETED |
07/28/2017 | REVISION - TENT PLAT & CORE RESUB | 08/25/2017 | COMPLETED |
10/30/2015 | DEV PKG - OK TO SUBMIT | 11/02/2015 | COMPLETED |
11/02/2015 | TENTATIVE PLAT REVIEW | 12/23/2015 | COMPLETED |
12/23/2015 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 01/22/2016 | COMPLETED |
Conditions
Permit Number - DP15-0191
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - MOUNTAIN VAIL ESTATES PART G, LOTS 1-95
Date | Description | Comments |
---|---|---|
01/05/2016 | 1,000 GPM FOR 60 MINUTES AT 20 PSI RESIDUAL PRESSURE IS REQUIRED AND FIRE HYDRANTS ARE REQUIRED PER IFC 2012 EDITION |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0191
Permit Description: TENTATIVE PLAT/FLD - MOUNTAIN VAIL ESTATES PART G, LOTS 1-95
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
11/26/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 11/26/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/29/2020 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/29/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/29/2020 | ENGR Engineering Final | Passed | {Activity date: 07/29/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 11/26/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - tHIS SIT HAS BEEN INSPECTED ON THIS DATE AND THE FOLLOWING HAS BEEN NOTED DURING THIS INSPECTION: 1) REMOVE ALL OF THE STORMWATER CONTROLS PRIOR TO REQUESTING THE FINAL INSPECTION AND RELEASE FOR THIS SITE. 2) PROVIDE ANY REVISED DRAWINGS IF THERE HAS BEEN ANY CHANGES, AND PROVIDE THIS DEPARTMENT WITH A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS PROJECT. 3) COMPLETE ALL WORK ON THIS SITE AS SHOWN ON THE APPROVED ON THIS PLANS, AND PROVIDE REVISED DOCUMENTATION IF NEEDED. 4) COMPLETE THE WORK ON THIS SITE TILL THERE IS LESS THAN ONE OPEN ACRE OF DISTURBED, THIS WILL ALLOW THE CLOSURE OF THE SWPPP PERMIT, AND PROVIDE THIS DEPARTMENT A COPY OF THE NOTICE OF TERMINATION APPROVAL FOR THIS SITE. 5) COMPLETE CONSTRUCTION ON ALL OF THE REMAINING OPEN LOTS THAT HAVE NOT BEEN COMPLETED AS FOLLOWS: UNDER CONSTRUCTION: LOTS 34, 16, 17, 18, 61, 41, NOT DEVELOPED: LOTS 29, 30, 31, 32, 33, 35, 60, 59, 58, 42, 44, } |