Permit: DP15-0188
Permit Details
Status:
Complete
Type:
Development Package
Address:
3700 S CALLE POLAR
Address NEW:
3700 S CALLE POLAR
Apply Date:
10/27/2015
Applicant:
Lisa Bowers
Description:
SITE/ GRADING -10 NEW VETERANS MULTI HOUSING BUILDINGS Originally approved 3/23/2016 (17 pages)
Permit Reviews
Permit Number - DP15-0188
Permit Status: Complete
Permit Description: SITE/ GRADING -10 NEW VETERANS MULTI HOUSING BUILDINGS Originally approved 3/23/2016 (17 pages)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/15/2016 | DEV PKG - RESUBMITTAL | 03/16/2016 | COMPLETED |
| 03/09/2017 | DEV PKG - REVISION | 03/17/2017 | COMPLETED |
| 03/16/2016 | DEV PKG - RESUBMITTAL | 04/19/2016 | COMPLETED |
| 03/17/2017 | DEV PKG - REVISION | 03/23/2017 | COMPLETED |
| 04/14/2017 | DEV PKG - REVISION | 04/21/2017 | COMPLETED |
| 10/27/2015 | DEV PKG - OK TO SUBMIT | 11/02/2015 | COMPLETED |
| 11/03/2015 | DEV PKG | 01/15/2016 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0188
Permit Description: SITE/ GRADING -10 NEW VETERANS MULTI HOUSING BUILDINGS Originally approved 3/23/2016 (17 pages)
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 06/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SITE IS IN COMPLIANCE WITH SWPPP AND COT INSPECTION RECOMMENDATIONS. 2) ENSURE TRACKING OF SOIL IS SWEPT ROUTINELY. 3) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE. 4) CALL IN FOLLOW UP INSPECTION AS NEEDED} |
|
| 06/23/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/23/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 06/16/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - MET WITH SUPERINTENDENT ON SITE. 1) CALL IN FOR A PRE-CON MEETING PER YOUR PERMIT/ APPROVED PLANS. 2) IMPLEMENT YOUR STORM WATER PLAN, PRIOR TO GRUBBING AND GRADING. 3) CALL FOR INSPECTION WHEN CONTROLS ARE INSTALLED. 4) SITE IS IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT AND PLAN, CONTINUED NON-COMPLIANCE MAY RESULT IN A STOP WORK ORDER.} |
|
| 04/14/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/14/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/14/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/22/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO STORMWATER CONCERNS AT THIS TIME.} ; {Activity date: 03/21/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE THE STORM WATER PLAN IS STILL IN EFFECT UNTIL THE SITE IS STABILIZED 2) FILE A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 03/06/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 02/02/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/19/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/02/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE SEDIEMNT CONTROLS REMAIN IN PLACE AND ARE MAINTAINED THROUGHOUT CONSTRUCTION 2) SWEEP UP TRACKED SOIL ROUTINELY 3) PERFOM SELF INSPECTION AND DOCUMENT THEM PER YOUR SWPPP.} ; {Activity date: 09/22/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE TEMPORARY SEDIMENT CONTROLS REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER PLAN AND DOCUMENTED} ; {Activity date: 07/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/24/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CHANGES AND/OR CONCERNS AT THIS TIME} |
|
| 04/14/2017 | ENGR Grading Final | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/14/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/14/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 04/14/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 04/26/2017 | ENGR Engineering Final | Passed | {Activity date: 04/26/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/24/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO PLANS ON SITE} ; {Activity date: 04/20/2017; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL} ; {Activity date: 04/19/2017; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT READY FOR FINAL APPROVAL} ; {Activity date: 04/14/2017; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE LANDSCAPING, TO INCLUDE ROCK AND ALL PLANTING PER THE APPROVED PLAN 2) PROVIDE A CITY OF TUCSON APPROVED PLAN FOR FINAL GRADING INSPECTION 3) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 4) COMPLETE ALL SITE WORK TO INCLUDE INSTALL OF ALL HADRAILING, AND ANY FLAT WORK SHOWN ON THE APPROVED PLANS} ; {Activity date: 03/21/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AN APPROVED PLAN SHOWING REVISION TO THE SITE FOR THE FINAL GRADING INSPECTION 2) PROVID A CERT STATEMENT FROM THE ENG OF RECORD PRIOR TO FINAL APPROVAL 3) COMPLETE ALL SITE WORK AND LANDSCAPING PRIOR TO FINAL APPROVAL} ; {Activity date: 10/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE ANY AND ALL CHANGES TO THE SITE/GRADING/LANDSCAPING, ARE SHOWN ON THE APPROVED PLANS AND ARE AVAILABLE FOR FINAL SITE INSPECTION} |