Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP15-0188
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by MRUSSO1 - |
| 06/16/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Continued | Entered by MRUSSO1 - MET WITH SUPERINTENDENT ON SITE. 1) CALL IN FOR A PRE-CON MEETING PER YOUR PERMIT/ APPROVED PLANS. 2) IMPLEMENT YOUR STORM WATER PLAN, PRIOR TO GRUBBING AND GRADING. 3) CALL FOR INSPECTION WHEN CONTROLS ARE INSTALLED. 4) SITE IS IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT AND PLAN, CONTINUED NON-COMPLIANCE MAY RESULT IN A STOP WORK ORDER. |