Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
10218 E OLD VAIL RD
Apply Date:
10/22/2015
Applicant:
Tri Miller
Description:
GRADING- SHOPS AT HOUGHTON TOWN CENTER

Permit Reviews

Permit Number - DP15-0183
Permit Status: Issued
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Start Date Submittal Complete Date Status  
04/17/2018 REVISION - GRADING 04/20/2018 COMPLETED Review Details
10/22/2015 DEV PKG - OK TO SUBMIT (GRADING ONLY) 10/22/2015 COMPLETED Review Details
10/22/2015 GRADING 04/03/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0183
Permit Status: Issued
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Outstanding Activity Conditions - 1
Date Name
04/20/2018 Barrier to keep vehicles from undeveloped area required.

Outstanding Inspections

Permit Status: Issued
Permit Number: DP15-0183
Permite Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP15-0183
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Completed Inspections - 6
Date Description Inspector Results Comments
09/07/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 09/05/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ARRIVED ON SITE AND CONTACTED THE SUPERVISOR FOR THE SITE, HE WAS NOT ABLE TO BE ONSITE AT THIS TIME. I HAVE ASKED THAT HE RESCHEDULE THE INSPECTION FOR TOMORROW SO HE CAN MEET WITH MIKE WHO WILL BE WATCHING THE SITE. I LOOKED OVER THE SITE THE WORK HAS STARTED AT THIS TIME, CREWS HAVE STARTED THE PLACEMENT OF CSP. I HAVE REMINDED THEM THAT THEY NEED TO MAKE SURE THE SITE IS POSTED FOR THE SWPPP AND ALL OF THE CONTROLS ARE IN PLACE PER THE APPROVED PLANS.} ; {Activity date: 09/07/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) SWEEP UP TRACKED SOIL ROUTINELY
4) POST A COPY OF YOUR NOI ON SITE
5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP
6) INSTALL A CONCRETE WASH OUT
7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER
8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER}
01/12/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
01/12/2018 SITE - Stormwater Follow-up Passed {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/12/2017; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) LOOKED AT 18 SRP INSTALL ALONG CENTER OF SITE.
2) LOOKED AT RE-BAR LAY OUT FOR BOTH CATCH BASINS AND COLLAR FO PIPE TRANSITION.
PIPE AND CATCH BASINS INSTALLED PER APPROVED PLANS - OK FOR CONCRETE
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
01/12/2018 SITE - Stormwater Final Inspection Passed {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOUR NOTICE OF TERMINATION WAS FILED WITH ADEQ}
01/12/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/07/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) SWEEP UP TRACKED SOIL ROUTINELY
4) POST A COPY OF YOUR NOI ON SITE
5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP
6) INSTALL A CONCRETE WASH OUT
7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER
8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER}
01/12/2018 COT - ENGR - Signage Final Passed {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 7.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / PAVING_2 OF 7.TIF DEVELOPMENT PACKAGE VIEW
003_NOTES / GRADING / DETAILS_3 OF 7.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING DETAILS_4 OF 7.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING DETAILS_5 OF 7.TIF DEVELOPMENT PACKAGE VIEW
006_HORIZONTAL CONTROL / DATA_6 OF 7.TIF DEVELOPMENT PACKAGE VIEW
001_HORIZONTAL CONTROL DATA.TIF.TIF DEVELOPMENT PACKAGE VIEW
007_SWPPP_7 OF 7.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW