Permit: DP15-0183
Permit Details
Status:
Issued
Type:
Development Package
Address:
10218 E OLD VAIL RD
Address NEW:
10218 E OLD VAIL RD
Apply Date:
10/22/2015
Applicant:
Tri Miller
Description:
GRADING- SHOPS AT HOUGHTON TOWN CENTER
Permit Reviews
Permit Number - DP15-0183
Permit Status: Issued
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/17/2018 | REVISION - GRADING | 04/20/2018 | COMPLETED |
| 10/22/2015 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 10/22/2015 | COMPLETED |
| 10/22/2015 | GRADING | 04/03/2018 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP15-0183
Permit Status: Issued
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/20/2018 | Barrier to keep vehicles from undeveloped area required. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP15-0183
Permite Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP15-0183
Permit Description: GRADING- SHOPS AT HOUGHTON TOWN CENTER
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/05/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ARRIVED ON SITE AND CONTACTED THE SUPERVISOR FOR THE SITE, HE WAS NOT ABLE TO BE ONSITE AT THIS TIME. I HAVE ASKED THAT HE RESCHEDULE THE INSPECTION FOR TOMORROW SO HE CAN MEET WITH MIKE WHO WILL BE WATCHING THE SITE. I LOOKED OVER THE SITE THE WORK HAS STARTED AT THIS TIME, CREWS HAVE STARTED THE PLACEMENT OF CSP. I HAVE REMINDED THEM THAT THEY NEED TO MAKE SURE THE SITE IS POSTED FOR THE SWPPP AND ALL OF THE CONTROLS ARE IN PLACE PER THE APPROVED PLANS.} ; {Activity date: 09/07/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) SWEEP UP TRACKED SOIL ROUTINELY 4) POST A COPY OF YOUR NOI ON SITE 5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP 6) INSTALL A CONCRETE WASH OUT 7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER 8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER} |
|
| 01/12/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 01/12/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/12/2017; Status: Continued; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) LOOKED AT 18 SRP INSTALL ALONG CENTER OF SITE. 2) LOOKED AT RE-BAR LAY OUT FOR BOTH CATCH BASINS AND COLLAR FO PIPE TRANSITION. PIPE AND CATCH BASINS INSTALLED PER APPROVED PLANS - OK FOR CONCRETE 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} |
|
| 01/12/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOUR NOTICE OF TERMINATION WAS FILED WITH ADEQ} | |
| 01/12/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/07/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION 3) SWEEP UP TRACKED SOIL ROUTINELY 4) POST A COPY OF YOUR NOI ON SITE 5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP 6) INSTALL A CONCRETE WASH OUT 7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER 8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER} |
|
| 01/12/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 01/12/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |