Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2018 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 09/07/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) SWEEP UP TRACKED SOIL ROUTINELY
4) POST A COPY OF YOUR NOI ON SITE
5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP
6) INSTALL A CONCRETE WASH OUT
7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER
8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER |