Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2017 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - ARRIVED ON SITE AND CONTACTED THE SUPERVISOR FOR THE SITE, HE WAS NOT ABLE TO BE ONSITE AT THIS TIME. I HAVE ASKED THAT HE RESCHEDULE THE INSPECTION FOR TOMORROW SO HE CAN MEET WITH MIKE WHO WILL BE WATCHING THE SITE. I LOOKED OVER THE SITE THE WORK HAS STARTED AT THIS TIME, CREWS HAVE STARTED THE PLACEMENT OF CSP. I HAVE REMINDED THEM THAT THEY NEED TO MAKE SURE THE SITE IS POSTED FOR THE SWPPP AND ALL OF THE CONTROLS ARE IN PLACE PER THE APPROVED PLANS. |
| 09/07/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION
3) SWEEP UP TRACKED SOIL ROUTINELY
4) POST A COPY OF YOUR NOI ON SITE
5) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP
6) INSTALL A CONCRETE WASH OUT
7) LOOKED AT INSTALL OF 18" SRP W/ CLEAN OUTS, INSTALLED PER PLAN - ENSURE PIPE IS BEDDED TO SPRING LINE PICS TAKEN, OK TO COVER
8) CALL FOR INSPECTION FOR RE-BAR LAY OUT FOR CATCH BASINS AND COLLAR CONNECTION PRIOR TO COVER |