Permit: DP15-0172
Permit Details
Status:
Complete
Type:
Development Package
Address:
8260 S HOUGHTON RD
Address NEW:
8260 S HOUGHTON RD
Apply Date:
10/01/2015
Applicant:
Lisa Bowers
Description:
SITE, GRADING,SWPPP
Permit Reviews
Permit Number - DP15-0172
Permit Status: Complete
Permit Description: SITE, GRADING,SWPPP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2016 | RESUB - SITE and/or GRADING | 10/27/2016 | COMPLETED |
| 10/01/2015 | DEV PKG - OK TO SUBMIT | 10/01/2015 | COMPLETED |
| 10/01/2015 | SITE and/or GRADING | 11/20/2015 | COMPLETED |
| 11/20/2015 | RESUB - SITE and/or GRADING | 01/05/2016 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP15-0172
Permit Status: Complete
Permit Description: SITE, GRADING,SWPPP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 01/08/2016 | The following 7 conditions apply to permit DP15-0172:1)Two copies of the SWPPP Report shall be submitted prior to issuance of grading permit DP15-0172.2)Call for SWPPP inspection and Grading Pre-construction meeting. For a PDSD Engineering Inspections, call IVR (791-3111), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888. Call for inspection of stormceptor connection to existing stormdrain pipe.3)There shall be no disturbance outside of the approved grading limits. Any grading outside of the grading limits requires separate grading permit or a submittal, review, and approval for separate permits.4)Temporary SWPP controls shall be placed at base of downstream slopes, around stormceptor, and other locations as shown on SWPP sheet, and shall be maintained during construction until all permanent control installations are completed. 5)If there are any revisions to design or construction, contact PDSD Engineering Inspector or PDSD Engineering Civil Engineer to discuss proposed change to determine whether one of the following may be needed: notation of change may be needed in system and later as-built, details of change, or revised plan submittal. 6)With as-built submittal, provide certification statements from EOR (for overall project substantial completion as well as bioswale and stormceptor infrastructure installation) prior to approval of final grading. Include as-built elevations of stormdrain pipe at stormceptor outlet, bioswale elevations, kiosk FFE, and other elevations as deemed necessary by RLS.7)Permitee shall notify PDSD when grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures, have been completed in accordance with approved grading plan and grading permit, and all conditions of permit are completed. |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0172
Permit Description: SITE, GRADING,SWPPP
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/24/2016; Status: Approved; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) PRE-CON MEETING DONE WITH SUPERINTENDENT AND ADMINISTRATIVE PERSONNEL. 2) ENSURE YOUR SWPPP IS IMPLEMENTED PER YOUR APPROVED PLAN AND YOUR AZPDES PERMIT. 3) CALL FOR INSPECTION FOR INSTALL OF SEDIMENT CONTROLS. 4) SITE IS CURRENTLY IN NON-COMPLIANCE WITH YOUR PERMIT DUE TO THE FACT THAT ROUGH GRADING HAS STARTED AND SWPPP CONTROLS HAVE NOT BEEN INSTALLED.} |
|
| 04/04/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/04/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED 2) SWEEP UP TRACKED SOIL AS NEEDED 3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PERMIT} |
|
| 07/08/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 07/08/2016 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 07/08/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 06/16/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 06/03/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) LOOKED AT PEDESTRIAN SIDEWALK ACCESS AROUND A LIGHT POLE BASE - OK FOR ACCESS 45" CLEAR SPACE. 2) ENSURE COMPLIANCE WITH SWPPP UNTIL PAVED. 3) LOOKED AT TRASH ENCLOSURE 4) CONTRACTOR WORKING ON SUB-GRADE FOR PAVING} ; {Activity date: 05/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/24/2016; Status: Correction Required; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) PRE-CON MEETING DONE WITH SUPERINTENDENT AND ADMINISTRATIVE PERSONNEL. 2) ENSURE YOUR SWPPP IS IMPLEMENTED PER YOUR APPROVED PLAN AND YOUR AZPDES PERMIT. 3) CALL FOR INSPECTION FOR INSTALL OF SEDIMENT CONTROLS. 4) SITE IS CURRENTLY IN NON-COMPLIANCE WITH YOUR PERMIT DUE TO THE FACT THAT ROUGH GRADING HAS STARTED AND SWPPP CONTROLS HAVE NOT BEEN INSTALLED.} |
|
| 07/08/2016 | ENGR Grading Final | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 07/08/2016 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 04/26/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE STILL WORKING AT THIS TIME AND IS NOT READY FOR THE FINAL INSPECTION.} | |
| 07/08/2016 | COT - ENGR - Signage Final | Passed | {Activity date: 07/08/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 08/05/2020 | ENGR Engineering Final | Passed | {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 07/08/2016; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD, CALL FOR RE-INSPECTION} ; {Activity date: 04/26/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - GRADING FINAL NOT READY AT THIS TIME. I HAVE ADVISED THE CONTRACTOR WHAT HE NEEDS TO DO FOR THE EXISTING CATCHBASIN THAT IS MISSING THE GRATES. HE WILL HAVE THEM INSTALL IN THE NEAR FUTURE AND WILL CALL THEM FOR THE RE-INSPECTION.} |