Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP15-0172
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2016 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by MRUSSO1 - |
| 06/16/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - |
| 06/03/2016 | SITE - Stormwater Follow-up | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) LOOKED AT PEDESTRIAN SIDEWALK ACCESS AROUND A LIGHT POLE BASE - OK FOR ACCESS 45" CLEAR SPACE. 2) ENSURE COMPLIANCE WITH SWPPP UNTIL PAVED. 3) LOOKED AT TRASH ENCLOSURE 4) CONTRACTOR WORKING ON SUB-GRADE FOR PAVING |
| 05/12/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/24/2016 | SITE - Stormwater Follow-up | MRUSSO1 | Correction Required | Entered by MRUSSO1 - 1) PRE-CON MEETING DONE WITH SUPERINTENDENT AND ADMINISTRATIVE PERSONNEL. 2) ENSURE YOUR SWPPP IS IMPLEMENTED PER YOUR APPROVED PLAN AND YOUR AZPDES PERMIT. 3) CALL FOR INSPECTION FOR INSTALL OF SEDIMENT CONTROLS. 4) SITE IS CURRENTLY IN NON-COMPLIANCE WITH YOUR PERMIT DUE TO THE FACT THAT ROUGH GRADING HAS STARTED AND SWPPP CONTROLS HAVE NOT BEEN INSTALLED. |