Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0172
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
| 07/08/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
| 07/08/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
| 04/04/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - RE-BAR LAYOUT FOR MANHOLE FLOOR ALONG WEST SIDE OF SITE, WAS INSTALLED PER PLAN - OK TO POUR CONCRETE |
| 07/08/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
| 06/16/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) ENSURE ANY WORK IN THE RIGHT-OF-WAY MUST BE INSPECTED AND MUST HAVE A RIGHT-OF-WAY PERMIT. 2) NO STORM WATER OR SITE/GRADING CONCERNS AT THIS TIME |
| 06/10/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRACTOR HAS FORMED THE CONCRETE VALLEY GUTTER PER APPROVED PLANS TO INCLUDE THE EXTRA FOOTING/PAD AT EACH EXPANSION JOINT PER (MAG STD DETAIL 204) 2) LOOKED AT FORMS AND RE-BAR LAYOUT FOR THE TRASH ENCLOSURE PAD AND BOLLARDS PICTURES TAKEN - OK TO POUR CONCRETE |
| 06/03/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) LOOKED AT PEDESTRIAN SIDEWALK ACCESS AROUND A LIGHT POLE BASE - OK FOR ACCESS 45" CLEAR SPACE. 2) ENSURE COMPLIANCE WITH SWPPP UNTIL PAVED. 3) LOOKED AT TRASH ENCLOSURE 4) CONTRACTOR WORKING ON SUB-GRADE FOR PAVING |
| 05/12/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - MET SUPERINTENDENT AT SITE, DISCUSSED TRASH ENCLOSURE CONSTRUCTION |
| 04/14/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRACTOR INSTALLING 10" PVC TRUNK LINE AND LATERALS TO ROOF DRAINS OFF OF GAS CANOPY. 2) PIPE INSTALLED PER PLAN - OK TO COVER 3) PICTURES TAKEN |