Permit Details

Status:
Complete
Type:
Development Package
Address:
516 W LESTER ST
Address NEW:
516 W LESTER ST
Apply Date:
09/22/2015
Applicant:
Description:
E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements

Permit Reviews

Permit Number - DP15-0166
Permit Status: Complete
Permit Description: E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements
Start Date Submittal Complete Date Status  
01/08/2016 RESUB - SITE and/or GRADING 02/04/2016 COMPLETED Review Details
02/05/2019 DEV PKG - REVISION 03/11/2019 COMPLETED Review Details
02/16/2016 RESUB - SITE and/or GRADING 03/17/2016 COMPLETED Review Details
03/17/2016 RESUB - SITE and/or GRADING 06/08/2018 COMPLETED Review Details
09/22/2015 DEV PKG - OK TO SUBMIT 09/23/2015 COMPLETED Review Details
09/22/2015 SITE and/or GRADING 10/27/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0166
Permit Description: E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements
Total Completed Inspections - 10
Date Description Inspector Results Comments
04/08/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by CBELL1 - }
04/08/2019 COT - ENGR - Signage Final Passed {Activity date: 04/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by CBELL1 - }
04/12/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/12/2019 ENGR Engineering Final Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/08/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by CBELL1 - Complete all work itself on the approved set of plans, provide certification letter from engineer of record, provided in OT notice of termination from Arizona Department of environmental quality.} ; {Activity date: 03/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I met with John and he went over some of the changes that were made to the project, I asked him for approved city plan revisions for all the changes and I informed him that the hand rails for the accessible ramps are typically installed with a tow kick. His plan is to not have a detail so I asked him for an RFI from his engineer.
I reminded John that we need a letter from his engineer for the work that was not inspected.}
04/12/2019 SITE - Stormwater Follow-up Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/30/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - there’s track out present on both streets contractor has been informed to clean it up.}
04/12/2019 ENGR Grading Final Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/12/2019 COT - FCON - Fire - Final Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/12/2019 SITE - Stormwater Final Inspection Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/08/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by CBELL1 - Provide this department set of approved drawings and certification letter from the engineer of record}
04/12/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/25/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no controls in place}
04/12/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
REV-1_REVISION LETTER 02.05.2019.PDF PLANS UNDER REVIEW VIEW
REV-1_SHEET 3 SITE PLAN.PDF PLANS UNDER REVIEW VIEW
REV-1_SHEET 5 UTILITY PLAN.PDF PLANS UNDER REVIEW VIEW
001_COVER SHEET_1 OF 10.TIF DEVELOPMENT PACKAGE VIEW
002_PLAN OF EXISTING_2 OF 10.TIF DEVELOPMENT PACKAGE VIEW
003_SITE PLAN_3 OF 10.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / PAVING / DRAINAGE_4 OF 10.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITY_5 OF 10.TIF DEVELOPMENT PACKAGE VIEW
006_DETAIL SHEET_6 OF 10.TIF DEVELOPMENT PACKAGE VIEW
007_PRESERVATION PLAN_L100.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE_L200.TIF DEVELOPMENT PACKAGE VIEW
009_IRRIGATION_L300.TIF DEVELOPMENT PACKAGE VIEW
010_RAINWATER HARVESTING_L400.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
PERMIT_EXTENSION 011819.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW