Permit: DP15-0166
Permit Details
Apply Date:
09/22/2015
Applicant:
Description:
E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements
Permit Reviews
Permit Number - DP15-0166
Permit Status: Complete
Permit Description: E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/08/2016 | RESUB - SITE and/or GRADING | 02/04/2016 | COMPLETED |
| 02/05/2019 | DEV PKG - REVISION | 03/11/2019 | COMPLETED |
| 02/16/2016 | RESUB - SITE and/or GRADING | 03/17/2016 | COMPLETED |
| 03/17/2016 | RESUB - SITE and/or GRADING | 06/08/2018 | COMPLETED |
| 09/22/2015 | DEV PKG - OK TO SUBMIT | 09/23/2015 | COMPLETED |
| 09/22/2015 | SITE and/or GRADING | 10/27/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0166
Permit Description: E SITE/GRADING - LESTER INDUSTRIAL, Warehouse facility site improvements
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by CBELL1 - } | |
| 04/08/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 04/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by CBELL1 - } | |
| 04/12/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 04/12/2019 | ENGR Engineering Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/08/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by CBELL1 - Complete all work itself on the approved set of plans, provide certification letter from engineer of record, provided in OT notice of termination from Arizona Department of environmental quality.} ; {Activity date: 03/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - I met with John and he went over some of the changes that were made to the project, I asked him for approved city plan revisions for all the changes and I informed him that the hand rails for the accessible ramps are typically installed with a tow kick. His plan is to not have a detail so I asked him for an RFI from his engineer. I reminded John that we need a letter from his engineer for the work that was not inspected.} |
|
| 04/12/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/30/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - there’s track out present on both streets contractor has been informed to clean it up.} | |
| 04/12/2019 | ENGR Grading Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 04/12/2019 | COT - FCON - Fire - Final | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 04/12/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/08/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by CBELL1 - Provide this department set of approved drawings and certification letter from the engineer of record} | |
| 04/12/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/25/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no controls in place} | |
| 04/12/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/12/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |