Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/08/2019 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by CBELL1 - |
| 03/15/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - I met with John and he went over some of the changes that were made to the project, I asked him for approved city plan revisions for all the changes and I informed him that the hand rails for the accessible ramps are typically installed with a tow kick. His plan is to not have a detail so I asked him for an RFI from his engineer.
I reminded John that we need a letter from his engineer for the work that was not inspected. |
| 04/12/2019 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/08/2019 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by CBELL1 - Complete all work itself on the approved set of plans, provide certification letter from engineer of record, provided in OT notice of termination from Arizona Department of environmental quality. |
| 03/15/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - I met with John and he went over some of the changes that were made to the project, I asked him for approved city plan revisions for all the changes and I informed him that the hand rails for the accessible ramps are typically installed with a tow kick. His plan is to not have a detail so I asked him for an RFI from his engineer.
I reminded John that we need a letter from his engineer for the work that was not inspected. |