Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/12/2019 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/12/2019 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/12/2019 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 04/12/2019 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/15/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - I met with John and he went over some of the changes that were made to the project, I asked him for approved city plan revisions for all the changes and I informed him that the hand rails for the accessible ramps are typically installed with a tow kick. His plan is to not have a detail so I asked him for an RFI from his engineer.
I reminded John that we need a letter from his engineer for the work that was not inspected. |
| 01/25/2019 |
ENGR Grading Final |
BBENEDON |
Denied |
Entered by CBELL1 - 18 inch HDPE installed on the south and north sides of the building without engineering inspectionAnd will require a letter from the project engineer and all changes will require revisions. The contractor is grading the parking lot, curbs have already been installed. Plan seems to indicate no trashing closure but rather a trashcan to be placed in the alley, I have requested John to get information from his engineer for this. |