Permit: DP15-0117
Permit Details
Apply Date:
07/28/2015
Applicant:
Description:
ADDITION TO SELF STORAGE:Originally approved 6/17/2016 (15 pages)1st Revision approved 7/11/20
Permit Reviews
Permit Number - DP15-0117
Permit Status: Complete
Permit Description: ADDITION TO SELF STORAGE:Originally approved 6/17/2016 (15 pages)1st Revision approved 7/11/20
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/25/2016 | TENTATIVE PLAT REVIEW | 04/18/2016 | COMPLETED |
| 04/20/2016 | TENTATIVE PLAT REVIEW | 06/08/2016 | COMPLETED |
| 05/04/2017 | REVISION - TENT PLAT & CORE RESUB | 07/05/2017 | COMPLETED |
| 06/09/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 06/20/2016 | COMPLETED |
| 07/06/2017 | REVISION - TENT PLAT & CORE RESUB | 07/27/2017 | COMPLETED |
| 07/28/2015 | DEV PKG - OK TO SUBMIT | 07/31/2015 | COMPLETED |
| 07/31/2015 | DEV PKG | 01/25/2016 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP15-0117
Permit Status: Complete
Permit Description: ADDITION TO SELF STORAGE:Originally approved 6/17/2016 (15 pages)1st Revision approved 7/11/20
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/18/2016 | Per Floodplain Use Permit T16OT00476The project shall be completed in accordance with the approved improvement plans: DP15-0117.All changes will require approval from Planning and Development Services Department.At the completion of the project the Engineer of Record must provide certification the project conforms to the approved plans.All changes must be presented as a revised Development Package and approved by Planning and Development Services Department before certificates of occupancy are issued for the new building. |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0117
Permit Description: ADDITION TO SELF STORAGE:Originally approved 6/17/2016 (15 pages)1st Revision approved 7/11/20
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/11/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT 5) INSTALL A CONCRETE WASH OUT 6) DOCUMENT ANY MODIFICATIONS TO THE SWPPP OR CHANGES MADE TO THE PLANS AND GET APPROVEAL FOR CHANGES 7) CALL FOR INSPECTION PRIOR TO COVERING STORM WATER PIPE, RE-BAR OR ANY OTHER DRAINAGE STRUCTURES OR TRASH ENCLOSURES} |
|
| 01/10/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/10/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 01/10/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/10/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/20/2016; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ADD SUPPLEMENTAL SEDIEMENT CONTROLS TO STOCKPILE PERIMETER @ NORTH END. 2) SWEEP UP TRACKED SOIL ROUTINELY 3) ENSURE STORM WATER SELF INSPECTION ARE PERFORMED AND DOCUMENTED 4) NO OTHER SWPPP CONCERNS AT THIS TIME} |
|
| 06/15/2017 | SITE - SWPPP Correction Notice | Passed | {Activity date: 06/15/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/09/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MAKE THE REPAIRS TO THE WADDLE AROUND THE STOCKPILE WHERE EROSION HAS COVERED UP THE WADDLE} | |
| 08/02/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/02/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/06/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/03/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP} ; {Activity date: 04/26/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/13/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE/EXIT 2) RE-INSTALL A CONCRETE WASH OUT ON SITE 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) CALL FOR INSPECTION FOR UNDERGROUND STORM PIPE PRIOR TO COVERING} ; {Activity date: 01/11/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU STAY IN COMPLIANCE WITH YOUR SWPPP AND ADEQ PERMIT} ; {Activity date: 01/10/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU COMPLY WITH YOUR SWPPP AND YOUR STORM WATER PERMIT} ; {Activity date: 12/08/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CHANGES} ; {Activity date: 11/21/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONTACT ON SITE} ; {Activity date: 11/04/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) RE-ESTABLISH PERIMETER SEDIMENT CONTROLS. 2) RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCE 3) REMOVE MATERIAL AND EQUIPMENT OFF OF SEDIMENT COBNTROLS 4) RE-INSTALL YOUR CONCRETE WASH OUT, IT'S NOT WORKING 5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) CALL FOR INSPECTION FOR STORM PIPE INSTALL PRIOR TO COVER CORRECT BY TEN WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION} ; {Activity date: 10/31/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE YOU COMPLY WITH YOUR SWPPP AND YOUR STORM WATER PERMIT} ; {Activity date: 09/09/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MODIFY AS NEEDED, AND MAKE THE REPAIRS TO THE WADDLE AROUND THE STOCKPILE WHERE EROSION HAS COVERED UP THE WADDLE} |
|
| 08/02/2017 | ENGR Grading Final | Passed | {Activity date: 08/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/02/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/02/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 08/02/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 08/03/2017 | ENGR Engineering Final | Passed | {Activity date: 08/03/2017; Status: Approved; Inspector: pyg; Comment: Entered by PGEHLEN1 - Cert letter in SIRE} ; {Activity date: 08/02/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD} |