Permit: DP15-0117

Parcel: Unknown


Addresses:

5010 N 1ST AV


Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0117

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
08/02/2017 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
06/06/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 -
05/03/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
04/26/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
01/13/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE/EXIT 2) RE-INSTALL A CONCRETE WASH OUT ON SITE 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) CALL FOR INSPECTION FOR UNDERGROUND STORM PIPE PRIOR TO COVERING
01/11/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE YOU STAY IN COMPLIANCE WITH YOUR SWPPP AND ADEQ PERMIT
01/10/2017 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ENSURE YOU COMPLY WITH YOUR SWPPP AND YOUR STORM WATER PERMIT
12/08/2016 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by MRUSSO1 - NO CHANGES
11/21/2016 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by MRUSSO1 - NO CONTACT ON SITE
11/04/2016 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by MRUSSO1 - 1) RE-ESTABLISH PERIMETER SEDIMENT CONTROLS. 2) RE-ESTABLISH STABILIZED CONSTRUCTION ENTRANCE 3) REMOVE MATERIAL AND EQUIPMENT OFF OF SEDIMENT COBNTROLS 4) RE-INSTALL YOUR CONCRETE WASH OUT, IT'S NOT WORKING 5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) CALL FOR INSPECTION FOR STORM PIPE INSTALL PRIOR TO COVER CORRECT BY TEN WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION
10/31/2016 SITE - Stormwater Follow-up MRUSSO Continued Entered by MRUSSO1 - ENSURE YOU COMPLY WITH YOUR SWPPP AND YOUR STORM WATER PERMIT
09/09/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MODIFY AS NEEDED, AND MAKE THE REPAIRS TO THE WADDLE AROUND THE STOCKPILE WHERE EROSION HAS COVERED UP THE WADDLE