Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
2385 N SILVERBELL RD
Apply Date:
06/15/2015
Applicant:
Tri Miller
Description:
SITE/GRADING/SWPPP - NEW RETAIL - T15CM05509

Permit Reviews

Permit Number - DP15-0093
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - NEW RETAIL - T15CM05509
Start Date Submittal Complete Date Status  
02/19/2016 REVISION - SITE 09/23/2016 COMPLETED Review Details
06/15/2015 DEV PKG - OK TO SUBMIT 06/16/2015 COMPLETED Review Details
06/16/2015 SITE and/or GRADING 07/22/2015 COMPLETED Review Details
07/30/2015 RESUB - SITE and/or GRADING 08/27/2015 COMPLETED Review Details
08/27/2015 RESUB - SITE and/or GRADING 09/04/2015 COMPLETED Review Details
09/04/2015 RESUB - SITE/GRADING ALL 02/19/2016 COMPLETED Review Details
09/23/2016 REVISION - GRADING 09/23/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0093
Permit Description: SITE/GRADING/SWPPP - NEW RETAIL - T15CM05509
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/15/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/15/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
2) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE NW CORNER IN ORDER TO PROTECT THE EXISTING STORM SEWER INLET
3) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AND IDENTIFY IT
4) PROVIDE A COPY OF YOUR PERMIT ON SITE
5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND PROVIDE A COPY
6) CALL FOR INSPECTION PRIOR TO COVER OF UNDERGROUND UTILITY WORK
7) SWEEP UP TRACKING AS NEEDED
8) WILL REVIEW NPPO FOR COMPLIANCE
} ; {Activity date: 04/14/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CONTACT ON SITE}
09/16/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 09/16/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
09/16/2016 SITE - Stormwater Follow-up Passed {Activity date: 09/16/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 08/11/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - CONTRACTOR TRACKING ONTO PUBLIC ROAD WAY, ASKED TO SWEEP UP} ; {Activity date: 07/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO INSPECTION CALLED IN NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/02/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO CHANGES, POST A COPY OF YOUR NOI AT THE SITE} ; {Activity date: 04/22/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) POST YOUR AUTHORIZATION # ON SITE
2) INSPECTED 18" HDPE STORM WATER PIPE ALONG THE NORTH/NW AND NE SIDES OF THE SITE - INSTALLED PER PLAN. - OK TO COVER, PCS TAKEN
3) CALL FOR INSPECTION FOR RE-BAR LAYOUT OF CATCH BASINS AND TRASH ENCLOSURES}
09/16/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 09/16/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 04/15/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
2) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE NW CORNER IN ORDER TO PROTECT THE EXISTING STORM SEWER INLET
3) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AND IDENTIFY IT
4) PROVIDE A COPY OF YOUR PERMIT ON SITE
5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND PROVIDE A COPY
6) CALL FOR INSPECTION PRIOR TO COVER OF UNDERGROUND UTILITY WORK
7) SWEEP UP TRACKING AS NEEDED
8) WILL REVIEW NPPO FOR COMPLIANCE
}
09/16/2016 COT - ENGR - Signage Final Passed {Activity date: 09/16/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
12/26/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/16/2016; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
12/26/2018 ENGR Grading Final Passed {Activity date: 12/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/16/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE DP15-0093 PERMIT IS FINALED, PRIOR TO APPROVAL. CALL IN FOR FINAL GRTADING INSPECTION
2) COMPLETE LANDSCAPING TO INCLUDE ROCK STABILIZATION AND RIP RAP
3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD
4) REMOVE CONSTRUCTION DEBRIS AND EQUIPMENT
5) PROVIDE A N APPROVED , REVISED PLAN FOR FINAL INSPECTION}
12/26/2018 SITE - Stormwater Final Inspection Passed {Activity date: 12/26/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/16/2016; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - FILE A NOTICE OF TERMINATION WITH THE STATE OF AZ}
08/05/2020 ENGR Engineering Final Passed {Activity date: 08/05/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/16/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) ENSURE DP15-0093 PERMIT IS FINALED, PRIOR TO APPROVAL. CALL IN FOR FINAL GRTADING INSPECTION
2) COMPLETE LANDSCAPING TO INCLUDE ROCK STABILIZATION AND RIP RAP
3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD
4) REMOVE CONSTRUCTION DEBRIS AND EQUIPMENT
5) PROVIDE A N APPROVED , REVISED PLAN FOR FINAL INSPECTION}

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 21.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / PAVING NOTES_2 OF 21.TIF DEVELOPMENT PACKAGE VIEW
003_PRIVATE UTILITY NOTES_3 OF 21.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_4 OF 21.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / PAVING_5 OF 21.TIF DEVELOPMENT PACKAGE VIEW
006_ADA SITE_6 OF 21.TIF DEVELOPMENT PACKAGE VIEW
007_SITE / GRADING / UTILITY DETAILS_7 OF 21.TIF DEVELOPMENT PACKAGE VIEW
008_SITE / GRADING DETAILS_8 OF 21.TIF DEVELOPMENT PACKAGE VIEW
009_PRIVATE UTILITY_9 OF 21.TIF DEVELOPMENT PACKAGE VIEW
010_HORIZONTAL CONTROL_10 OF 21.TIF DEVELOPMENT PACKAGE VIEW
011_SWPPP_11 OF 21.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE GENERAL NOTES_12 OF 21.TIF DEVELOPMENT PACKAGE VIEW
013_LANDSCAPE DETAILS_13 OF 21.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE SPECIFICATIONS_14 OF 21.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE SPECIFICATIONS_15 OF 21.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE SPECIFICATIONS_16 OF 21.TIF DEVELOPMENT PACKAGE VIEW
017_PLANTING_17 OF 21.TIF DEVELOPMENT PACKAGE VIEW
018_IRRIGATION_18 OF 21.TIF DEVELOPMENT PACKAGE VIEW
019_WATER HARVESTING IMPLEMENTATION_19 OF 21.TIF DEVELOPMENT PACKAGE VIEW
020_NPPP_20 OF 21.TIF DEVELOPMENT PACKAGE VIEW
021_NPPP_21 OF 21.TIF DEVELOPMENT PACKAGE VIEW
116-01-002A_1.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW