Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP15-0093
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by MRUSSO1 - 1) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE 2) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE NW CORNER IN ORDER TO PROTECT THE EXISTING STORM SEWER INLET 3) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE AND IDENTIFY IT 4) PROVIDE A COPY OF YOUR PERMIT ON SITE 5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND PROVIDE A COPY 6) CALL FOR INSPECTION PRIOR TO COVER OF UNDERGROUND UTILITY WORK 7) SWEEP UP TRACKING AS NEEDED 8) WILL REVIEW NPPO FOR COMPLIANCE |
| 04/14/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Continued | Entered by MRUSSO1 - NO CONTACT ON SITE |