Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0093
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/16/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
| 07/07/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONCRETE COLLAR CONNECTION BETWEEN HDPE STORM PIPE AND RCP MUST HAVE RE-ENFORCEMENT PER APPROVED PLANS, SEE NOTE #22 PAGE 5. 2) RE-INSTALL SEDIEMNT CONTROLS PER YOUR SWPPP 3) CALL FOR RE-INSPECTION FOR RE-BAR LAYOUT PRIOR TO COVER |
| 06/07/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT SITE WORK AT THIS TIME, CONTRACTOR WORKING ON THE BLDG |
| 05/02/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - INSPECTED CATCH BASINS ALONG THE WEST AND NW SIDES OF THE SITE. PICTURES TAKEN |
| 04/22/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) POST YOUR AUTHORIZATION # ON SITE 2) INSPECTED 18" HDPE STORM WATER PIPE ALONG THE NORTH/NW AND NE SIDES OF THE SITE - INSTALLED PER PLAN. - OK TO COVER, PCS TAKEN 3) CALL FOR INSPECTION FOR RE-BAR LAYOUT OF CATCH BASINS AND TRASH ENCLOSURES |
| 12/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 04/12/2016 | ENGR Grading Final | DROBERTS | Denied | Entered by DROBERT5 - CHECKED THE AREA TOO SEE WHAT WORK HAS BEEN COMPLETED AT THIS TIME. CREWS WORKING ON THE CONSTRUCTION OF THE BUILDING FOOTERS FOR THE NEW CVS PHARMACY, NO INSPECTIONS HAVE BEEN SCHEDULED AT THIS TIME. |
| 12/26/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
| 09/16/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) ENSURE DP15-0093 PERMIT IS FINALED, PRIOR TO APPROVAL. CALL IN FOR FINAL GRTADING INSPECTION 2) COMPLETE LANDSCAPING TO INCLUDE ROCK STABILIZATION AND RIP RAP 3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD 4) REMOVE CONSTRUCTION DEBRIS AND EQUIPMENT 5) PROVIDE A N APPROVED , REVISED PLAN FOR FINAL INSPECTION |