Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
03/06/2015
Applicant:
Lisa Bowers
Description:
DP: MANNING HOUSE Originally approved 5/26/20151st revision approved 11/5/2015 (sheets 1 and

Permit Reviews

Permit Number - DP15-0036
Permit Status: Complete
Permit Description: DP: MANNING HOUSE Originally approved 5/26/20151st revision approved 11/5/2015 (sheets 1 and
Start Date Submittal Complete Date Status  
02/23/2016 DEV PKG - REVISION 03/07/2016 COMPLETED Review Details
03/06/2015 DEV PKG - OK TO SUBMIT 03/06/2015 COMPLETED Review Details
03/06/2015 DEV PKG 04/06/2015 COMPLETED Review Details
04/21/2015 DEV PKG - RESUBMITTAL 05/15/2015 COMPLETED Review Details
05/15/2015 DEV PKG - RESUBMITTAL 05/28/2015 COMPLETED Review Details
05/28/2015 DEV PKG - RESUBMITTAL 10/29/2015 COMPLETED Review Details
10/30/2015 DEV PKG - REVISION 11/05/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0036
Permit Description: DP: MANNING HOUSE Originally approved 5/26/20151st revision approved 11/5/2015 (sheets 1 and
Total Completed Inspections - 7
Date Description Inspector Results Comments
06/03/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 06/03/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN
2) SITE DISTURBANCE IS < 1 ACRE THEREFORE A SWPPP AND NOI IS NOT REQUIRED, HOWEVER THE CONTRACTOR MUST ENSURE THE SOIL FORM CONSTRUCTION IS KEPT ON SITE.
3) A CONCRETE WASH OUT AND STABILIZED ENTRANCE WILL BE INSTALLED AND USED.
4) MAINATIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT
5) CALL FOR ANY SITE/GRADING/LANDSCAPE QUESTIONS OR CONCERNS}
06/03/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/03/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN
2) SITE DISTURBANCE IS < 1 ACRE THEREFORE A SWPPP AND NOI IS NOT REQUIRED, HOWEVER THE CONTRACTOR MUST ENSURE THE SOIL FORM CONSTRUCTION IS KEPT ON SITE.
3) A CONCRETE WASH OUT AND STABILIZED ENTRANCE WILL BE INSTALLED AND USED.
4) MAINATIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT
5) CALL FOR ANY SITE/GRADING/LANDSCAPE QUESTIONS OR CONCERNS}
03/17/2016 SITE - Stormwater Follow-up Passed {Activity date: 03/17/2016; Status: Approved; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - } ; {Activity date: 11/18/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PREVIOUS CONCERNS HAVE BEEN ADDRESSED AT THIS TIME, HAVE ADVISED THE CONTRACTOR THAT THEY WILL NEED TO NOTE ANY CHANGES ON THE REVISED DRAWINGS PRIOR TO THE FINAL. PREVIOUS CONCERNS HAVE BEEN ADDRESSED WITH THE STORMWATER SO THERE ARE NO CONCERNS AT THIS TIME.} ; {Activity date: 11/05/2015; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REPLACE SEDIMENT CONTROLS ALONG THE NORTH PERIMETER
2) PER YOUR STORM WATER PLAN AND ADEQ, STORM WATER CONTROLS MUST BE REPLACED IF THEY LOSE 50% OF THIER EFFECTIVENESS.
3) COMPLY WITH IN TWO WEEKS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION} ; {Activity date: 10/08/2015; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CORRECTION REQUIRED:
1) MAINTAIN STORM WATER CONTROLS THROUGHOUT CONSTRUCTION, RE-ESTABLISH IF NECESSARY.
2) REMOVE MATERIAL, EQUIPMENT AND DEBRIS OFF OF STORM WATER CONTROLS
3) PERFORM STORM WATER SELF INSPECTIONS PER YOUR PLAN.} ; {Activity date: 09/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) SWEEP UP TRACKED SOIL
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP} ; {Activity date: 07/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
04/12/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/12/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 03/17/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - LANDSCAPING NOT COMPLETED PER APPROVED PLAN}
04/12/2016 SITE - Stormwater Final Inspection Passed {Activity date: 04/12/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE YOU SUBMIT A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 03/17/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - ENSURE SITE IS COMPLETELY STABILIZED, FILE A NOTICE OF TERMINATION WITH ADEQ}
04/22/2016 RSBU - Building Final Passed {Activity date: 04/22/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/22/2016 ENGR Engineering Final Passed {Activity date: 04/22/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE THROUGH THIS SITE TO SEE IF IT HAD BEEN COMPLETED. THIS SITE HAS BEEN CLOSED OUT ON THE PERMIT BUT NEEDS TO BE FINALED.} ; {Activity date: 04/13/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 04/12/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLANS} ; {Activity date: 03/17/2016; Status: Prior to Final Inspectn; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - PRIOR TO FINAL APPROVAL:
1) ADDRESS THE STORM WATER DRAINAGE FROM ROOF DRAINS ALONG THE NEAST CORNER OF THE BLDG.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
3) COMPLETE ALL LANDSCAPING PER APPROVED PLAN
4) PROVIDE AN APPROVED AS-BUILT DRAWING}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 13.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 13.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 13.TIF DEVELOPMENT PACKAGE VIEW
004_UTILITIES / EASEMENTS_4 OF 13.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING_5 OF 13.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 13.TIF DEVELOPMENT PACKAGE VIEW
007_DEMOLITION_7 OF 13.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP_8 OF 13.TIF DEVELOPMENT PACKAGE VIEW
009_NPPO_9 OF 13.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE_10 OF 13.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION_11 OF 13.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE DETAILS_12 OF 13.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION DETAILS_13 OF 13.TIF DEVELOPMENT PACKAGE VIEW
PAG DP15-0036 MANNING HOUSE CALC.PDF DOCUMENTS VIEW
PAG DP15-0036 MANNING HOUSE.PDF DOCUMENTS VIEW
TEP DP15-0036.PDF DOCUMENTS VIEW
TW DP15-0036.PDF DOCUMENTS VIEW
2015-01 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY_1.PDF DOCUMENTS VIEW
SWG DP15-0036 MANNING HOUSE.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW