Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/03/2015 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER PLAN
2) SITE DISTURBANCE IS < 1 ACRE THEREFORE A SWPPP AND NOI IS NOT REQUIRED, HOWEVER THE CONTRACTOR MUST ENSURE THE SOIL FORM CONSTRUCTION IS KEPT ON SITE.
3) A CONCRETE WASH OUT AND STABILIZED ENTRANCE WILL BE INSTALLED AND USED.
4) MAINATIN SEDIMENT CONTROLS THROUGHOUT THE PROJECT
5) CALL FOR ANY SITE/GRADING/LANDSCAPE QUESTIONS OR CONCERNS |