Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel11619226E
JurisdictionTucson, Pima County
City of Tucson ZoningPAD-2
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
RedevelopmentDowntown Redevelopment District
Tucson Registered NeighborhoodEl Presidio
National Register Historic DistrictEl Presidio Historic District
Structure on National Register of Historic Places

Contributor

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 450 W PASEO REDONDO
Date - 11/06/2026 5:58 a.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202
Original Town Of Tucson ORIGINAL

Rezoning Cases

Date - 11/06/2026 5:58 a.m.
Total Number Of Rezone Cases - (2)
Case No. Description New Zone Status Status Date
C9-82-SP-2 La Entrada PAD PAD-2 Effectuated 07/17/2012
C9-98-SP-2B La Entrada Re-Development Plan/ Specific Plan PAD-AMEND Effectuated 04/30/2009

Permits

Address: 450 W PASEO REDONDO
Date - 11/06/2026 5:58 a.m.
Total Number Of Permits - (11)
Permit Status Apply Date Expired Date Unit Type Description
T20FC00807 Expired 12/02/2020 01/14/2022 Fire Construction Permit Automatic Fire Extingshing Sys - *** NO PLANS *** Modify fire sprinkler system to accommodate existing building changes.; Commercial Fire Sprinkler Systems - Modification of heads: 6
TR-ROW-1026-01186 In Review 10/26/2026 N/A Right-of-Way (ROW) This engineering plan details infrastructure and traffic control improvements along W. Saint Mary's Road, focusing on multi-modal transit enhancements, pavement marking modifications, and new signage installation. Key Infrastructure Elements • Shared-Use Path: Construction of a new asphalt or concrete path entering from the south, tying directly into W. Saint Mary's Road via a specific radius modification detailed in "Path Return Detail-A." • Pavement Striping: Placement of a 4-inch solid yellow centerline at the path entrance along with specialized "Look" pavement safety markings near the roadway interface. • Green Bike Lanes: Application of high-visibility thermo-plastic green stripe bike lane markings along the shoulder of W. Saint Mary's Road to protect cyclists. • Bike Wayfinding: Installation of specific bike wayfinding stencils (depicted in the legend detail) to guide cyclists along the route. Signage Upgrades • Stop Signs: Installation of a standard R1-1 (18"x18") STOP sign on a new post at the path approach. • Pedestrian Regulatory Signs: Placement of an R9-3 (24"x24") "No Pedestrian Crossing" style regulatory sign paired with a W16-7P arrow plaque on a new post. • Wayfinding Signs: Installation of a large R1-5a (36"x42") multi-use path wayfinding and regulatory sign assembly. Traffic Control & Engineering Notes • Stationing Coordinates: Precise geometric alignment utilizing a standard stationing system (e.g., Sta 100+35 to Sta 100+79) with specific northing and easting radius points. • Property Coordination: The work area directly borders parcel 116-19-156B (657 W. Saint Marys Road) and parcel 116-19-1600, both listed under the Werschky Richard & Mary Family Trust. If you would like, I can transcribe specific coordinate points or provide a breakdown of the materials and dimensions shown in the detail drawings. Try without personalization You said: Give me a scope of work Give me a scope of work October 21, 2026 Scope of Work: W. Saint Marys Road Multi-Use Path & Bike Lane Improvements 1. Project Overview The Contractor shall furnish all labor, materials, equipment, and traffic control necessary to construct a new shared-use path connection, install high-visibility green bike lanes, and update regulatory signage along W. Saint Marys Road. The project aims to improve multi-modal safety and connectivity bordering parcels 116-19-156B and 116-19-1600. 2. Detailed Scope of Construction Elements Civil & Earthwork (Path Return Detail-A) • Excavate and grade the path approach intersecting the south side of W. Saint Marys Road. • Construct a shared-use path return conforming to the precise geometric radii and coordinate limits specified on the plan view: • Establish the west radius point at Sta. 100+39.95, 10.00’ RT (N: 448257.5208, E: 989340.3903). • Establish the east radius point at Sta. 100+45.46, 10.00’ LT (N: 448246.5433, E: 989357.9935). • Pour or pave standard subgrade and finish course matching existing multi-use path infrastructure standards. Pavement Markings & Striping • Yellow Centerline: Apply a 4-inch solid yellow thermoplastic line (12 Linear Feet) along the centerline of the new shared-use path approach to separate directional travel. • Green Bike Lanes: Install high-visibility green thermoplastic pavement texturing/striping across the bike lane conflicts along the shoulder of W. Saint Marys Road. • Pedestrian Safety Markings: Lay down specialized "LOOK" pavement markings on the path approach at Sta. 100+56.62 (65.54’ LT) and Sta. 100+73.04 (144.40’ LT) to alert path users before crossing. • Bike Wayfinding Symbol: Apply white thermoplastic Bike Wayfinding Legend stencils (as detailed on the drawing) to guide cyclists along the route. Signage Installation • New Post Installations: Furnish and install three (3) new sign posts behind the curb line. • Regulatory Signs: • Install one (1) R1-1 STOP sign (18” x 18”) on a new post at the path egress point. • Install one (1) R9-3 Sign (24” x 24”) paired with an M6-3 / W16-3P arrow plaque (18” x 12”) on a new post near the path intersection. • Install one (1) R1-5a Sign (36” x 42”) multi-use path regulatory assembly on a new post at Sta. 100+79.15 (154.07’ LT). 3. Traffic Control & Safety Requirements • MUTCD Compliance: All temporary traffic control, lane shifts, or shoulder closures on W. Saint Marys Road must strictly comply with local guidelines and the Manual on Uniform Traffic Control Devices (MUTCD). • Pedestrian Access: Maintain an ADA-compliant pedestrian detour or protective boundary if construction impacts active sidewalks or bike paths. If you are drafting this for a formal bid or permit package, let me know if you would like me to: • Estimate material quantities based on the notes (e.g., linear feet of striping). • Draft a standard Project Schedule/Duration section. • Add standard utility coordination boilerplates. Try without personalization You sent: 1 image and said: Give me a detailed description of the scope of work going on here. Give me a detailed description of the scope of work going on here. This engineering plan details a civil infrastructure and safety improvement project at the intersection of W. Congress Street and W. Alameda Street (running adjacent to the I-10 Frontage Road) in Tucson, Arizona. The work primarily focuses on modernizing pedestrian facilities, modifying existing concrete structures, and adjusting utilities to match new grades between Station 120+00 and Station 130+00. 1. Concrete & Pedestrian Improvements • ADA Curb Ramps: Construction of two new curb access ramps designed to comply with current ADA standards: • One new ramp at Sta. 124+03.22, 59.56' LT. • A second new ramp located directly across the intersection at Sta. 124+43.32, 59.56' LT. • Concrete Walkways: Installation of a new concrete walk segment (per City of Tucson Detail No. 206) transitioning into the existing 6-foot-wide concrete walk path. • Removals: Sawcutting and removing designated portions of existing concrete curb and sidewalk segments to clear the footprint for the new ADA ramps. 2. Utility & Structure Adjustments • Manhole Adjustments: Adjusting multiple existing manholes to match the final finish grade of the new infrastructure: • Manhole MH 5010-054 (noted for grade adjustment). • Manhole MH 4153-104 (noted for grade adjustment). • Pull Box Modifications: Adjusting an existing electric pull box cover to meet the new match grade. • Protection in Place: Ensuring the existing Southern Pacific Railroad track and specific high-voltage or communication utility alignments remain undisturbed throughout the construction footprint. 3. Demolition, Clearing, and Grubbing • Tree & Irrigation Removal: Clearing and removing existing trees and underlying irrigation systems impacting the work zone near Station 122+00. • Curb & Wall Modifications: Sawcutting and removing a 19-linear-foot section of existing concrete curb, alongside targeted modifications to an existing concrete retaining wall. • Light Pole Removals: Relocating or removing designated existing light poles within the right-of-way to clear conflicts. 4. Property Boundaries & Coordinates • The project limits cross and tie into several major public and commercial parcels, including: • City of Tucson right-of-way and parcels (116-19-205E, 116-19-230A). • State of Arizona properties (116-19-205F, 116-19-113A). • Commercial properties owned by Circle K Stores LLC (116-19-192A, 116-19-201C).
DS15-25 Approved 10/20/2015 N/A Zoning Verification Letter MANNING HOUSE - TSMR Modify enclosure diminsions Section 8-01.5.2 Figure B
TC-COM-1026-01692 In Review 10/14/2026 N/A BLDG 1 Commercial Building Remodel existing office space
TR-UTL-0823-02286 Complete 08/16/2023 10/26/2023 Right-of-Way (ROW) - Utility P.155377: ACCESS OF EX MH 2490, HH 2720, HH 2970 AND HH 3405 FOR SPLICING
DP19-0170 Complete 07/18/2019 12/14/2020 Development Package SITE/RNA - El Rio Manning House, entry circle.
TR-UTL-0525-00826 Complete 05/22/2025 07/25/2025 Right-of-Way (ROW) - Utility A.3067069 - ACCESS HH 3405 & HH 2970 FOR SPLICING ON ALEMEDA ST
T20FC00329 Expired 05/13/2020 05/26/2021 Fire Construction Permit Fire Alarm & Detection Systems - *** NO PLANS *** Modification to existing fire sprinkler system to accommodate tenant changes; Commercial Fire Sprinkler Systems - Modification of heads: 1
T17FC00355 Expired 05/01/2017 05/10/2018 02 Fire Construction Permit Fire Alarm & Detection Systems - Install 3 Horn Strobes in the third floor shell area; Fire Alarm Systems - Devices Modified: 3
T22FC00259 Expired 04/05/2022 05/03/2023 Fire Construction Permit Automatic Fire Extingshing Sys - Modify existing fire sprinkler system to conform to new floor plan.; Commercial Fire Sprinkler Systems - Modification of heads: 4
DP15-0036 Complete 03/06/2015 10/19/2016 02 Development Package DP: MANNING HOUSE Originally approved 5/26/20151st revision approved 11/5/2015 (sheets 1 and