Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
10051 E OLD VAIL RD
Apply Date:
12/24/2014
Applicant:
Description:
*Revision 10 started 11/6/24 *Revision #9 started 2/8/24* SITE - OLD VAIL PLAZA PHASE 1 (1-17)

Permit Reviews

Permit Number - DP14-0248
Permit Status: Issued
Permit Description: *Revision 10 started 11/6/24 *Revision #9 started 2/8/24* SITE - OLD VAIL PLAZA PHASE 1 (1-17)
Start Date Submittal Complete Date Status  
01/05/2017 REVISION - TENT PLAT & CORE RESUB 02/24/2017 COMPLETED Review Details
01/17/2020 REVISION - TENT PLAT & CORE RESUB 01/23/2020 COMPLETED Review Details
02/24/2017 REVISION - TENT PLAT & CORE RESUB 03/07/2017 COMPLETED Review Details
03/09/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 04/21/2015 COMPLETED Review Details
04/21/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/15/2015 COMPLETED Review Details
05/15/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 05/27/2015 COMPLETED Review Details
05/27/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 06/17/2015 COMPLETED Review Details
06/17/2015 REVISION - TENT PLAT & CORE RESUB 07/14/2015 COMPLETED Review Details
07/14/2015 REVISION - TENT PLAT & CORE RESUB 07/16/2015 COMPLETED Review Details
08/01/2018 REVISION - TENT PLAT & CORE RESUB 09/04/2018 COMPLETED Review Details
10/24/2016 REVISION - TENT PLAT & CORE RESUB 11/15/2016 COMPLETED Review Details
11/15/2016 REVISION - TENT PLAT & CORE RESUB 11/16/2016 COMPLETED Review Details
11/16/2016 REVISION - TENT PLAT & CORE RESUB 12/02/2016 COMPLETED Review Details
11/16/2017 REVISION - TENT PLAT & CORE RESUB 11/28/2017 COMPLETED Review Details
12/05/2016 REVISION - TENT PLAT & CORE RESUB 01/03/2017 COMPLETED Review Details
12/09/2019 REVISION - TENT PLAT & CORE RESUB 01/07/2020 COMPLETED Review Details
12/24/2014 TENTATIVE PLAT REVIEW 02/26/2015 COMPLETED Review Details
08/31/2023 DEVELOPMENT PACKAGE NEW v.1 10/05/2023 REQUIRES RESUBMIT Review Details
11/13/2023 DEVELOPMENT PACKAGE NEW v.2 12/13/2023 APPROVED Review Details
02/08/2024 DEVELOPMENT PACKAGE NEW v.1 04/09/2024 APPROVED Review Details
11/06/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/12/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP14-0248
Permite Description: *Revision 10 started 11/6/24 *Revision #9 started 2/8/24* SITE - OLD VAIL PLAZA PHASE 1 (1-17)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/28/2017 SITE - Stormwater Final Inspection N/A Complete (Recurring) {Activity date: 12/28/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE YOU COMPLY WITH YOUR SWPPP AND STORM WATER PERMIT}
12/01/2020 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 12/01/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/17/2020; Status: Continued; Inspector: RDELONNE; Comment: Entered by PAHUMAD1 - Continue. No concerns at this time.} ; {Activity date: 11/05/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No activity on site no controls on site.} ; {Activity date: 10/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. No activity on site. No controls in place no stormwater Information sign on site.} ; {Activity date: 10/22/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. No controls have been installed since last inspection. Not able to find stormwater information sign on site.} ; {Activity date: 09/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No temporary stormwater controls in place. NOI Is not posted on site that I could find. No grading activity at this time.} ; {Activity date: 02/14/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO NOI POSTED ON SITE. STORMWATER CONTROLS NOT BEING MAINTAINED OR REPAIRED.} ; {Activity date: 01/03/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WITH GC ABOUT INSTALLING NOI AT GATE . PROVIDEING TRACK OUT ROCK . AND CLEAN TRACK OUT FROM STREET. AND INSTALLING SWPPP CONTROLS.} ; {Activity date: 12/12/2018; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT INSTALLING SWPPP AND INSTALLING SIGN AT ENTRANCE.} ; {Activity date: 01/05/2018; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
04/25/2024 ENGR Engineering Final N/A Not Ready Contractors going to need to reschedule. Contractor has no permit and the plans have not been reviewed yet.

Completed Inspections

Permit Status: Issued
Permit Number: DP14-0248
Permit Description: *Revision 10 started 11/6/24 *Revision #9 started 2/8/24* SITE - OLD VAIL PLAZA PHASE 1 (1-17)
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/08/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/08/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE DISCUSSED REVISIONS TO THE ORIGINAL PLANS.
ALL INSPECTIONS WILL BE DOCUMENTED UNDER PERMIT # T09BU00395.}
12/03/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 12/03/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
05/20/2025 ENGR Engineering Final Passed
05/20/2025 PDSD Site/Engineering Division - Landscaping Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV10_1_PLAN SET - 5338A_DP-REV10 - 2024-11-01 - COMPLETE_V1 APPROVED.PDF DOCUMENTS VIEW
CIVIL_RESPONSE, 01.16.2020.PDF DOCUMENTS VIEW