Permit: DP14-0248

Parcel: 141185840


Addresses:

10051 E OLD VAIL RD

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final Not Ready
09/16/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by JSCHNEI2 - Partial approval. OK for TCO. Part of development package for address 10185 old Vail rd Has been completed. Overall development package has not been completed only reason for TCO.
09/15/2020 ENGR Engineering Final RLEDONNE Partial Approval Entered by RSALDAT1 - Partial approval. For address 10185 E. Old Vail Rd.. OK for TCO only. After talking to contractor he is going to repair ADA parking tomorrow. Complete install of bicycle parking pin backs for trash enclosure complete staking of trees.
09/14/2020 ENGR Engineering Final RLEDONNE Not ready for Inspection Entered by JSCHNEI2 - Not ready. For building at address 10185 E. Old Vale Rd. ADA parking is over 2%. Complete installOf long-term bicycle parking. Drill pin backs for trashing closure. Steak trees per detail.
12/03/2015 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - 1) PRIOR TO FINAL COMPLETE ALL SITE/GRADING AND LANDSCAPING SHOWN ON THE APPROVED PLANS. 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD. 3) PROVIDE AND AS-BUILT TO THE CITY OF TUCSON.
07/08/2015 ENGR Engineering Final MRUSSO Continued Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE DISCUSSED REVISIONS TO THE ORIGINAL PLANS. ALL INSPECTIONS WILL BE DOCUMENTED UNDER PERMIT # T09BU00395.
01/23/2024 ENGR Engineering Final Partial Pass Contractor needs to R&R for handicap parking areas on the west end of the project and add another course of walk to the trash enclosure on the west end of the project. Complete the landscaping plants and irrigation and riprap.
04/25/2024 ENGR Engineering Final Not Ready Contractors going to need to reschedule. Contractor has no permit and the plans have not been reviewed yet.
05/20/2025 ENGR Engineering Final Passed
11/21/2023 ENGR Engineering Final Not Ready Site is now going through its 8th revision, I spoke with the engineer on record and 3 lots should be ready soon with a 4th coming.