Permit: DP14-0212
Permit Details
Apply Date:
11/18/2014
Applicant:
Lisa Bowers
Description:
SITE - NEW RETAIL BUILDING - T14CM08825
Permit Reviews
Permit Number - DP14-0212
Permit Status: Complete
Permit Description: SITE - NEW RETAIL BUILDING - T14CM08825
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/27/2015 | RESUB - SITE and/or GRADING | 03/25/2015 | COMPLETED |
03/25/2015 | RESUB - SITE and/or GRADING | 04/08/2015 | ACTIVE |
11/18/2014 | DEV PKG - OK TO SUBMIT | 11/18/2014 | COMPLETED |
11/18/2014 | SITE and/or GRADING | 01/27/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0212
Permit Description: SITE - NEW RETAIL BUILDING - T14CM08825
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/27/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A COPY OF YOUR NOI AT THE SITE 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 6) SWEEP UP TRACKED SOIL ROUTINELY 7) ANY CHANGES AND/OR SITE CONCERNS CALL FOR INSPECTION} ; {Activity date: 04/24/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NEW SITE, LEFT NOTE FOR SUPERINTENDENT. SMALL SITE RETAIL SHELL} |
|
05/12/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/12/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED PER YOUR STORM WATER PLAN - SITE DISTURBANCE IS LESS THAN 1 ACRE HOWEVER THE SITE HAS A STORM WATER PLAN} ; {Activity date: 04/30/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE INSTALLED PER YOUR SWPPP - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION} ; {Activity date: 04/27/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A COPY OF YOUR NOI AT THE SITE 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 6) SWEEP UP TRACKED SOIL ROUTINELY 7) ANY CHANGES AND/OR SITE CONCERNS CALL FOR INSPECTION} |
|
10/23/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/23/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCWERNS AT THIS TIME} ; {Activity date: 09/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) SITE IS UNDER A SWPPP UNTIL IT IS 100% STABILIZED 3) SWEEP UP ANY TRACKING OF SOIL OFF SITE 4) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME MINIMAL SITE WORK, CONTRACTOR WORKING ON BLDG} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE HC ACCESS AND PARKING MEET CODE 2) TRASH ENCLOSURES MUST BE 10'X10' CLEAR WIDTH 3) ENSURE SCUPPERS ARE INSTALLED AT MAIN ROOF DRAINS 4) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO ENG FINAL APPROVAL 5) ENSURE ROCK RIP RAP WORK IS PER PLAN 6) ENSURE COMPLIANCE WITH YOUR SWPPP} ; {Activity date: 07/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG AND UTILITIES, VERY LITTLE SITE WORK AT THIS TIME 2) SWEEP UP TRACKED SOIL 3) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM} ; {Activity date: 07/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONSTRUCTION ACTIVITY AT THE TIME OF INSPECTION 2) CONTRACTOR HAS BUILT THE BLDG PAD AND COMPLETED MOST OF THE UTILITY WORK, NO SITE WORK AT THIS TIME 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TI} |
|
11/25/2015 | ENGR Engineering Final | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL GRADING APPROVAL: 1) PROVIDE A CERT STATEMENT FROM THE EOR 2) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH FOR CHANGES MADE 3) INSTALL A SEDIMENT BARRIER FRO THE ADJACENT LOT 4) COMPLETE LANDSCAPING/SITE WORK PER APPROVED PLANS} |
|
11/25/2015 | ENGR Grading Final | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES OR CONCERNS} ; {Activity date: 09/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTIONS CALLED IN. NO SITE CONCERNS AT THIS TIME} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME MINIMAL SITE WORK, CONTRACTOR WORKING ON BLDG} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE HC ACCESS AND PARKING MEET CODE 2) TRASH ENCLOSURES MUST BE 10'X10' CLEAR WIDTH 3) ENSURE SCUPPERS ARE INSTALLED AT MAIN ROOF DRAINS 4) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO ENG FINAL APPROVAL 5) ENSURE ROCK RIP RAP WORK IS PER PLAN 6) ENSURE COMPLIANCE WITH YOUR SWPPP} ; {Activity date: 07/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG AND UTILITIES, VERY LITTLE SITE WORK AT THIS TIME 2) SWEEP UP TRACKED SOIL 3) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM} ; {Activity date: 06/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONSTRUCTION ACTIVITY AT THE TIME OF INSPECTION 2) CONTRACTOR HAS BUILT THE BLDG PAD AND COMPLETED MOST OF THE UTILITY WORK, NO SITE WORK AT THIS TIME 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR HAS OVER-EXCAVATED THE BLDG PAD AND IS POURING FOOTINGS.} |
|
11/25/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE A NOTICE OF TERMINATIONIS FILED WITH ADEQ} | |
01/09/2017 | RSBU - Building Final | Passed | {Activity date: 01/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |