Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
245 S WILMOT RD
Apply Date:
11/18/2014
Applicant:
Lisa Bowers
Description:
SITE - NEW RETAIL BUILDING - T14CM08825

Permit Reviews

Permit Number - DP14-0212
Permit Status: Complete
Permit Description: SITE - NEW RETAIL BUILDING - T14CM08825
Start Date Submittal Complete Date Status  
01/27/2015 RESUB - SITE and/or GRADING 03/25/2015 COMPLETED Review Details
03/25/2015 RESUB - SITE and/or GRADING 04/08/2015 ACTIVE Review Details
11/18/2014 DEV PKG - OK TO SUBMIT 11/18/2014 COMPLETED Review Details
11/18/2014 SITE and/or GRADING 01/27/2015 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0212
Permit Description: SITE - NEW RETAIL BUILDING - T14CM08825
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/27/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/27/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE SITE
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) SWEEP UP TRACKED SOIL ROUTINELY
7) ANY CHANGES AND/OR SITE CONCERNS CALL FOR INSPECTION} ; {Activity date: 04/24/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NEW SITE, LEFT NOTE FOR SUPERINTENDENT.
SMALL SITE RETAIL SHELL}
05/12/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 05/12/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
SEDIMENT CONTROLS HAVE BEEN INSTALLED PER YOUR STORM WATER PLAN - SITE DISTURBANCE IS LESS THAN 1 ACRE HOWEVER THE SITE HAS A STORM WATER PLAN} ; {Activity date: 04/30/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE INSTALLED PER YOUR SWPPP - NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION} ; {Activity date: 04/27/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP
2) POST A COPY OF YOUR NOI AT THE SITE
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN
4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) SWEEP UP TRACKED SOIL ROUTINELY
7) ANY CHANGES AND/OR SITE CONCERNS CALL FOR INSPECTION}
10/23/2015 SITE - Stormwater Follow-up Passed {Activity date: 10/23/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCWERNS AT THIS TIME} ; {Activity date: 09/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
2) SITE IS UNDER A SWPPP UNTIL IT IS 100% STABILIZED
3) SWEEP UP ANY TRACKING OF SOIL OFF SITE
4) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
MINIMAL SITE WORK, CONTRACTOR WORKING ON BLDG} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE HC ACCESS AND PARKING MEET CODE
2) TRASH ENCLOSURES MUST BE 10'X10' CLEAR WIDTH
3) ENSURE SCUPPERS ARE INSTALLED AT MAIN ROOF DRAINS
4) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO ENG FINAL APPROVAL
5) ENSURE ROCK RIP RAP WORK IS PER PLAN
6) ENSURE COMPLIANCE WITH YOUR SWPPP} ; {Activity date: 07/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG AND UTILITIES, VERY LITTLE SITE WORK AT THIS TIME
2) SWEEP UP TRACKED SOIL
3) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM} ; {Activity date: 07/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONSTRUCTION ACTIVITY AT THE TIME OF INSPECTION
2) CONTRACTOR HAS BUILT THE BLDG PAD AND COMPLETED MOST OF THE UTILITY WORK, NO SITE WORK AT THIS TIME
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TI}
11/25/2015 ENGR Engineering Final Passed {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL GRADING APPROVAL:
1) PROVIDE A CERT STATEMENT FROM THE EOR
2) PROVIDE APPROVAL FROM THE LANDSCAPE ARCH FOR CHANGES MADE
3) INSTALL A SEDIMENT BARRIER FRO THE ADJACENT LOT
4) COMPLETE LANDSCAPING/SITE WORK PER APPROVED PLANS}
11/25/2015 ENGR Grading Final Passed {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES OR CONCERNS} ; {Activity date: 09/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO INSPECTIONS CALLED IN.
NO SITE CONCERNS AT THIS TIME} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
MINIMAL SITE WORK, CONTRACTOR WORKING ON BLDG} ; {Activity date: 08/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE HC ACCESS AND PARKING MEET CODE
2) TRASH ENCLOSURES MUST BE 10'X10' CLEAR WIDTH
3) ENSURE SCUPPERS ARE INSTALLED AT MAIN ROOF DRAINS
4) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO ENG FINAL APPROVAL
5) ENSURE ROCK RIP RAP WORK IS PER PLAN
6) ENSURE COMPLIANCE WITH YOUR SWPPP} ; {Activity date: 07/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG AND UTILITIES, VERY LITTLE SITE WORK AT THIS TIME
2) SWEEP UP TRACKED SOIL
3) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM} ; {Activity date: 06/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONSTRUCTION ACTIVITY AT THE TIME OF INSPECTION
2) CONTRACTOR HAS BUILT THE BLDG PAD AND COMPLETED MOST OF THE UTILITY WORK, NO SITE WORK AT THIS TIME
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR HAS OVER-EXCAVATED THE BLDG PAD AND IS POURING FOOTINGS.}
11/25/2015 SITE - Stormwater Final Inspection Passed {Activity date: 11/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE A NOTICE OF TERMINATIONIS FILED WITH ADEQ}
01/09/2017 RSBU - Building Final Passed {Activity date: 01/09/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_1 OF 13.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 13.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 13.TIF DEVELOPMENT PACKAGE VIEW
004_UTILITIES / EASEMENTS_4 OF 13.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING_5 OF 13.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 13.TIF DEVELOPMENT PACKAGE VIEW
007_DEMOLITION_7 OF 13.TIF DEVELOPMENT PACKAGE VIEW
008_SWPPP_8 OF 13.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE_9 OF 13.TIF DEVELOPMENT PACKAGE VIEW
010_RAINWATER HARVESTING_10 OF 13.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION_11 OF 13.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE DETAILS_12 OF 13.TIF DEVELOPMENT PACKAGE VIEW
013_IRRIGATION DETAILS_13 OF 13.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW