Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP14-0212
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2015 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP 2) POST A COPY OF YOUR NOI AT THE SITE 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR STORM WATER PLAN 4) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 6) SWEEP UP TRACKED SOIL ROUTINELY 7) ANY CHANGES AND/OR SITE CONCERNS CALL FOR INSPECTION |
04/24/2015 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Continued | Entered by DROBERT5 - NEW SITE, LEFT NOTE FOR SUPERINTENDENT. SMALL SITE RETAIL SHELL |