Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0212
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2015 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
10/05/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCWERNS AT THIS TIME |
09/17/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) SITE IS UNDER A SWPPP UNTIL IT IS 100% STABILIZED 3) SWEEP UP ANY TRACKING OF SOIL OFF SITE 4) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. |
08/18/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME MINIMAL SITE WORK, CONTRACTOR WORKING ON BLDG |
08/18/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE HC ACCESS AND PARKING MEET CODE 2) TRASH ENCLOSURES MUST BE 10'X10' CLEAR WIDTH 3) ENSURE SCUPPERS ARE INSTALLED AT MAIN ROOF DRAINS 4) PROVIDE A CERT STATEMENT FROM THE EOR PRIOR TO ENG FINAL APPROVAL 5) ENSURE ROCK RIP RAP WORK IS PER PLAN 6) ENSURE COMPLIANCE WITH YOUR SWPPP |
07/13/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BLDG AND UTILITIES, VERY LITTLE SITE WORK AT THIS TIME 2) SWEEP UP TRACKED SOIL 3) PERFORM STORM WATER SELF INSPECTIONS AND DOCUMENT THEM |
07/07/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
06/01/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO CONSTRUCTION ACTIVITY AT THE TIME OF INSPECTION 2) CONTRACTOR HAS BUILT THE BLDG PAD AND COMPLETED MOST OF THE UTILITY WORK, NO SITE WORK AT THIS TIME 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TI |