Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
5150 N GRACIOUS CT
Apply Date:
11/04/2014
Applicant:
Description:
GRADING

Permit Reviews

Permit Number - DP14-0204
Permit Status: Complete
Permit Description: GRADING
Start Date Submittal Complete Date Status  
06/25/2015 REVISION - GRADING 08/12/2015 COMPLETED Review Details
11/04/2014 GRADING 11/21/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0204
Permit Description: GRADING
Total Completed Inspections - 7
Date Description Inspector Results Comments
12/12/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER THE APPROVED PLAN.
2) ENSURE THE GRADING LIMIT IS CLEARLY MARKED DURING CONSTRUCTION.
3) SWEEP UP ANY TRACKING OFF ADJACENT ROADWAY.
4) SHOW ANY SIGNIFICANT CHANGES TO THE APPROVED SITE/GRADING PLAN.
5) ENSURE CONSTRUCTION DOES NOT ENCROACH ON THE ADJACENT SCENIC COORIDOR.}
02/18/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 02/18/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STORM WATER CONTROLS HAVE BEEN INSTALLED} ; {Activity date: 12/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS ARE INSTALLED}
06/05/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 04/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NPPO HAS BEEN COMPLETED PER THE APPROVED PLAN
2) COMPLETE LANDSCAPING PER PLAN}
06/05/2015 SITE - Stormwater Follow-up Passed {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 05/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/03/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) PRIOR TO FINAL PROVIDE A CERT LETTER FROM THE EOR
3) SWEEP UP TRACKING
4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION} ; {Activity date: 03/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. ENSURE ROCK RIP RAP IS INSTALLED PER APPROVED PLAN
2. COMPLETE DRIVEWAY PER PLAN PRIOR TO FINAL APPROVAL
3. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME}
06/05/2015 ENGR Grading Final Passed {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 05/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME}
06/05/2015 SITE - Stormwater Final Inspection Passed {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - }
06/10/2015 ENGR Engineering Final Passed {Activity date: 06/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/05/2015; Status: Partial Approval; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN.
2) ADD A STATEMENT FROM THE ENG OF RECORD SHOWING THE CHANGE OF MATERIAL FROM CONCRETE TO PAVERS FOR THE DRIVEWAY}

Documents

File Name Document Type  
001_SHEET 1 OF 2.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 2 OF 2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW