Permit: DP14-0204
Permit Details
Status:
Complete
Type:
Development Package
Address:
5150 N GRACIOUS CT
Address NEW:
5150 N GRACIOUS CT
Apply Date:
11/04/2014
Applicant:
Description:
GRADING
Permit Reviews
Permit Number - DP14-0204
Permit Status: Complete
Permit Description: GRADING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2015 | REVISION - GRADING | 08/12/2015 | COMPLETED |
| 11/04/2014 | GRADING | 11/21/2014 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0204
Permit Description: GRADING
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/12/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER THE APPROVED PLAN. 2) ENSURE THE GRADING LIMIT IS CLEARLY MARKED DURING CONSTRUCTION. 3) SWEEP UP ANY TRACKING OFF ADJACENT ROADWAY. 4) SHOW ANY SIGNIFICANT CHANGES TO THE APPROVED SITE/GRADING PLAN. 5) ENSURE CONSTRUCTION DOES NOT ENCROACH ON THE ADJACENT SCENIC COORIDOR.} |
|
| 02/18/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/18/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STORM WATER CONTROLS HAVE BEEN INSTALLED} ; {Activity date: 12/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS ARE INSTALLED} | |
| 06/05/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 04/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NPPO HAS BEEN COMPLETED PER THE APPROVED PLAN 2) COMPLETE LANDSCAPING PER PLAN} |
|
| 06/05/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 05/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/03/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) PRIOR TO FINAL PROVIDE A CERT LETTER FROM THE EOR 3) SWEEP UP TRACKING 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION} ; {Activity date: 03/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. ENSURE ROCK RIP RAP IS INSTALLED PER APPROVED PLAN 2. COMPLETE DRIVEWAY PER PLAN PRIOR TO FINAL APPROVAL 3. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME} |
|
| 06/05/2015 | ENGR Grading Final | Passed | {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 05/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/18/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND OR CONCERNS AT THIS TIME} ; {Activity date: 02/10/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME} | |
| 06/05/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/05/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } | |
| 06/10/2015 | ENGR Engineering Final | Passed | {Activity date: 06/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 06/05/2015; Status: Partial Approval; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN. 2) ADD A STATEMENT FROM THE ENG OF RECORD SHOWING THE CHANGE OF MATERIAL FROM CONCRETE TO PAVERS FOR THE DRIVEWAY} |