Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 06/05/2015 |
SITE - Stormwater Follow-up
|
MRUSSO1 |
Approved |
Entered by DROBERT5 - |
| 05/15/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 04/03/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) PRIOR TO FINAL PROVIDE A CERT LETTER FROM THE EOR
3) SWEEP UP TRACKING
4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION |
| 03/18/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by CSHARRA1 - 1. ENSURE ROCK RIP RAP IS INSTALLED PER APPROVED PLAN
2. COMPLETE DRIVEWAY PER PLAN PRIOR TO FINAL APPROVAL
3. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/26/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/18/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/10/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER/SITE CONCERNS AT THIS TIME |