Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2015 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 06/05/2015 |
ENGR Engineering Final
|
MRUSSO1 |
Partial Approval |
Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD STATING THAT THE SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN.
2) ADD A STATEMENT FROM THE ENG OF RECORD SHOWING THE CHANGE OF MATERIAL FROM CONCRETE TO PAVERS FOR THE DRIVEWAY |