Permit Details

Status:
Complete
Type:
Development Package
Address:
307 E HELEN ST
Apply Date:
03/13/2014
Applicant:
Description:
SITE/GRADING; NEW SANCTUARY

Permit Reviews

Permit Number - DP14-0040
Permit Status: Complete
Permit Description: SITE/GRADING; NEW SANCTUARY
Start Date Submittal Complete Date Status  
02/06/2015 RESUB - SITE/GRADING ALL 03/09/2015 COMPLETED Review Details
03/10/2015 RESUB - SITE/GRADING ALL 07/06/2015 COMPLETED Review Details
03/13/2014 DEV PKG - OK TO SUBMIT 03/21/2014 COMPLETED Review Details
03/21/2014 SITE and/or GRADING 05/23/2014 COMPLETED Review Details
03/22/2016 REVISION - SITE 03/22/2016 COMPLETED Review Details
10/27/2016 REVISION - SITE 10/27/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0040
Permit Description: SITE/GRADING; NEW SANCTUARY
Total Completed Inspections - 7
Date Description Inspector Results Comments
04/26/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/26/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PLANS MAY BE MODIFIED TO CHANGE THE CURB LAYOUT ON THE WEST SIDE OF THE PARKING LOT.}
02/23/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - WALED THE SITE AND HAVE NOTED THAT MOST OF THE PLANTS HAVE NOT BEEN INSTALLED ON THIS SITE AT THIS TIME.}
02/23/2017 ENGR Engineering Final Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CURRENTLY THE WORK THAT IS NEEDED TO COMPLETE THIS SITE FOR ENGINEERING: PROVIDE REVISED DRAWINGS SHOWING ALL THE CHANGES THAT HAVE BEEN MADE TO THE SITE. THIS WILL INCLUDE BUT NOT LIMITED TOO MISSING CURBS, MISSING WALLS(4) AND GATES, MISSING LANDSCAPING MATERIALS(WEST AND SOUTH SIDES OF PROJECT), MISSING BICYCLE PARKING SPACES. 2) CERTIFICATION LETTER FROM THE E.O.R. STATING THAT THE SITE HAS BEEN COMPLETED PER THE APPROVED REVISED DRAWINGS. 3) ROOF DRAINS THAT DRAIN WATER ONTO THE BRICK PAVERS IN THE COMMON AREA BETWEEN THE TWO BUILDING. 4) THE CHANGE FROM ASPHALT TO CONCRETE FOR THE PARKING AREAS. 5) RESOLVE THE ISSUES WITH THE PARKING SPACES AND THE PAALS NOT BEING TO THE PROPER DIMENSIONS. IT APPEARS THAT THE CONCRETE PARKING LOT WAS NOT POURED TO THE PROPER DIMENSIONS OF 60' FROM EDGE TO EDGE. THE CURRENT WIDTH OF THE SITE IS 57 FEET 4 INCHES, THIS CAUSES THE PARKING SPACES TO BE APPROXIMATELY 13 TO 15 INCHES SHORT OF THE REQUIRED LENGTH OF 216 INCHES. I TRIED TO CONTACT JOEL KRAMER AT ENVISION(520-318-3400) BUT HE WAS NOT AVAILABLE. CALLED HIS CELLPHONE AND LEFT A MESSAGE, SO I ASKED HIM TO CALL ME BACK SO WE CAN DISCUSS ALL THE PROBLEMS WITH THE SITE.
HE RETURNED MY CALL AT 12:30 AND WE HAVE DECIDED TO MEET ONSITE ON 9/7/2016 WITH THE OWNER AND ARMANDO QUIROZ.} ; {Activity date: 05/20/2016; Status: Denied; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - BUILD THE SITE/GRADING PER THE APPROVED PLANS/OR PROVIDE AND APPROVED PLAN THAT SHOWS WHAT YOU BUILT}
02/23/2017 SITE - Stormwater Follow-up Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/23/2017 ENGR Grading Final Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 09/01/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CURRENTLY THE WORK THAT IS NEEDED TO COMPLETE THIS SITE FOR ENGINEERING: PROVIDE REVISED DRAWINGS SHOWING ALL THE CHANGES THAT HAVE BEEN MADE TO THE SITE. THIS WILL INCLUDE BUT NOT LIMITED TOO MISSING CURBS, MISSING WALLS(4) AND GATES, MISSING LANDSCAPING MATERIALS(WEST AND SOUTH SIDES OF PROJECT), MISSING BICYCLE PARKING SPACES. 2) CERTIFICATION LETTER FROM THE E.O.R. STATING THAT THE SITE HAS BEEN COMPLETED PER THE APPROVED REVISED DRAWINGS. 3) ROOF DRAINS THAT DRAIN WATER ONTO THE BRICK PAVERS IN THE COMMON AREA BETWEEN THE TWO BUILDING. 4) THE CHANGE FROM ASPHALT TO CONCRETE FOR THE PARKING AREAS. 5) RESOLVE THE ISSUES WITH THE PARKING SPACES AND THE PAALS NOT BEING TO THE PROPER DIMENSIONS. IT APPEARS THAT THE CONCRETE PARKING LOT WAS NOT POURED TO THE PROPER DIMENSIONS OF 60' FROM EDGE TO EDGE. THE CURRENT WIDTH OF THE SITE IS 57 FEET 4 INCHES, THIS CAUSES THE PARKING SPACES TO BE APPROXIMATELY 13 TO 15 INCHES SHORT OF THE REQUIRED LENGTH OF 216 INCHES.}
02/23/2017 SITE - Stormwater Final Inspection Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
02/23/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 02/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_T1.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_C1.TIF DEVELOPMENT PACKAGE VIEW
003_PAVING / GRADING_C2.TIF DEVELOPMENT PACKAGE VIEW
004_DEMOLITION SITE_C3.TIF DEVELOPMENT PACKAGE VIEW
005_SITE DETAILS_C4.TIF DEVELOPMENT PACKAGE VIEW
006_SITE DETAILS_C5.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_L1.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE DETIALS_L2.TIF DEVELOPMENT PACKAGE VIEW
009_IRRIGATION_I1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW