Permit: DP14-0031
Permit Details
Status:
Complete
Type:
Development Package
Address:
7050 S PALO VERDE RD
Address NEW:
7050 S PALO VERDE RD
Apply Date:
02/26/2014
Applicant:
Description:
FEDEX GROUND - GRADING/SWPP- Rough grading only. The DP13-0030 will serve as the construction docum
Permit Reviews
Permit Number - DP14-0031
Permit Status: Complete
Permit Description: FEDEX GROUND - GRADING/SWPP- Rough grading only. The DP13-0030 will serve as the construction docum
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2014 | DEV PKG - OK TO SUBMIT | 02/26/2014 | COMPLETED |
| 02/26/2014 | SITE and/or GRADING | 03/25/2014 | COMPLETED |
| 04/16/2014 | RESUB - SITE/GRADING ALL | 07/23/2014 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP14-0031
Permite Description: FEDEX GROUND - GRADING/SWPP- Rough grading only. The DP13-0030 will serve as the construction docum
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2014 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 08/05/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR FOR PRE-CON NO AP PLANS OR PERMITS ON SITE.} |
| 03/13/2015 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 03/13/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by CSHARRA1 - INSTALLING FORMS AND HORIZONTAL REBAR FOR SOUTHWEST BASIN} |
| 08/25/2015 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 08/25/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 06/10/2015; Status: Correction Required; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 05/19/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH EDDIE ABOUT SWPPP CONTROLS AND REPORT.} ; {Activity date: 01/06/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT HAS BEEN CLEANED OFF STREETS.} ; {Activity date: 12/16/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/09/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CARONA STREET HAS BEEN CLEANED.} ; {Activity date: 12/02/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STREETS LOOKING CLEAN AT THIS TIME.} ; {Activity date: 11/19/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE. GOT WITH GC ABOUT TRASH CLEAN UP.} ; {Activity date: 11/12/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GRADING CONTRACTORS BUILT A OVER SIZE CONCRETE WASH OUT.} ; {Activity date: 11/03/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH SWPPP CONTRACTOR ABOUT NEW WASH OUT ON SOUTH SIDE OF SITE.} ; {Activity date: 10/24/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 10/08/2014; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC TO CLEAN CONCRETE OUT OF BASIN TODAY AND CLEAN WASH OUT. AND COMPLET SWPPP CONTROLS.} ; {Activity date: 09/09/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NOI SIGN INSTALLED AT GATE.} ; {Activity date: 08/29/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO NOI ON SITE.} ; {Activity date: 08/26/2014; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - NOI NOT ON SITE .ACTIVITY # ON SWPPP SIGN NOT NOI #.} ; {Activity date: 08/21/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT AND INSTALLING NOI INFO AT GATE.} ; {Activity date: 08/19/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STILL NO NOI INFO AT ENTRANCE.} ; {Activity date: 08/15/2014; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GOT WITH GC ABOUT INSTALLING NOI INFO.} |
| 09/08/2015 | ENGR Grading Final | N/A | Complete (Recurring) | {Activity date: 09/08/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALLING RIP-RAP IN BASIN ON EAST SIDE OF SITE.} ; {Activity date: 08/27/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH CONTRACTOR INSTALLING RIP-RAP LOOKING FOR DIMENSIONS ON AP PLANS.} ; {Activity date: 08/17/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC WENT OVER RIP RAP.} ; {Activity date: 07/22/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON SIDE WALKS TO REPAIR SLOPES OVER 2%.} ; {Activity date: 07/07/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC CALLED TO MEET ON SITE BUT WAS NOT ON SITE .} ; {Activity date: 10/03/2014; Status: Continued; Inspector: RLEODNNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH GC AND GRADING CONTRACTING WENT OVER SWPPP PLANS FOR REPAIRS.} |