Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Grading Final
Permit Number - DP14-0031
Inspection Description - ENGR Grading Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2015 | ENGR Grading Final | RLEDONNE | Partial Approval | Entered by CSHARRA1 - REBAR INSTALLED PER AP PLANS FOR HEAD WALL @ SOUTHWEST BASIN |
| 09/08/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALLING RIP-RAP IN BASIN ON EAST SIDE OF SITE. |
| 08/27/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH CONTRACTOR INSTALLING RIP-RAP LOOKING FOR DIMENSIONS ON AP PLANS. |
| 08/17/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC WENT OVER RIP RAP. |
| 07/22/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON SIDE WALKS TO REPAIR SLOPES OVER 2%. |
| 07/07/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC CALLED TO MEET ON SITE BUT WAS NOT ON SITE . |
| 10/03/2014 | ENGR Grading Final | RLEODNNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC AND GRADING CONTRACTING WENT OVER SWPPP PLANS FOR REPAIRS. |
| 10/06/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY OUT SIDE BUILDING. |
| 08/17/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 08/05/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
| 07/21/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC NOT ON SITE. |
| 06/02/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CURBING ON SOUTH SIDE OF BUILDING. |
| 04/09/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by ARUIZ1 - TALKED TO GC ABOUT PLANS FOR SITE SEWER. HE SAYS THEY ARE AT PIMA COUNTY |
| 03/12/2015 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - MET WITH GC AND JIM BURGE ON SITE TO GO OVER SITE SEWER. |
| 03/03/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PROVIDE AP INSTALL OF STROM DRAIN PIPIING. ON SOUTH WEST SIDE OF SITE. 36''. |
| 02/23/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT CLEANING AROUND SITE. |
| 02/06/2015 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 02/02/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY AT THIS TIME. |
| 01/08/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/30/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRECH DRAINS. AFTER TLAKING WITH BOB SHERRY. |
| 12/29/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRECH DRAINS AT LOADING DOCKS. |
| 12/10/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 12/05/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MUD ON ROAD SOUTH OF SITE. GOT WITH GC ABOUT TACK OUT. |
| 11/24/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 11/13/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 11/05/2014 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/29/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC WENT OVER SWPPP INFO. |
| 10/13/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH SWPPP CONTRACTOR. |
| 10/10/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY DO TO RAIN. |
| 09/02/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC HAD NOI ON SITE. AND WORKING ON KEEPING UP SWPPP CONTOLS. |
| 08/12/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GOT WITH GC ABOUT NOI INFO SIGN AND TRACK OUT. |
| 06/24/2014 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY AT THIS TIME. |