Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/25/2015 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 06/10/2015 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Correction Required |
Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 05/19/2015 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH EDDIE ABOUT SWPPP CONTROLS AND REPORT. |
| 01/06/2015 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - TRACK OUT HAS BEEN CLEANED OFF STREETS. |
| 12/16/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/09/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - CARONA STREET HAS BEEN CLEANED. |
| 12/02/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STREETS LOOKING CLEAN AT THIS TIME. |
| 11/19/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - WALKED SITE. GOT WITH GC ABOUT TRASH CLEAN UP. |
| 11/12/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GRADING CONTRACTORS BUILT A OVER SIZE CONCRETE WASH OUT. |
| 11/03/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH SWPPP CONTRACTOR ABOUT NEW WASH OUT ON SOUTH SIDE OF SITE. |
| 10/24/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/15/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
| 10/08/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - GOT WITH GC TO CLEAN CONCRETE OUT OF BASIN TODAY AND CLEAN WASH OUT. AND COMPLET SWPPP CONTROLS. |
| 09/09/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NOI SIGN INSTALLED AT GATE. |
| 08/29/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO NOI ON SITE. |
| 08/26/2014 |
SITE - Stormwater Follow-up
|
RLEDONN1 |
Continued |
Entered by RLEDONN1 - NOI NOT ON SITE .ACTIVITY # ON SWPPP SIGN NOT NOI #. |
| 08/21/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC ABOUT TRACK OUT AND INSTALLING NOI INFO AT GATE. |
| 08/19/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - STILL NO NOI INFO AT ENTRANCE. |
| 08/15/2014 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - GOT WITH GC ABOUT INSTALLING NOI INFO. |